Question: A factory manufactures shoes and slipper. It takes 1
hour of labour work on machine A and 3 hours on machine B to
produce a shoe. It takes 3 hours of
machine A and 1 hour on machine B to produce a slipper. A profit of
Rs.20 per shoe and Rs 10 per slipper is earned. How many of each
must be produced per
day so as to maximize the profit, if machines can be operated for
maximum 12 hours per day?
Let denote the number of shoes and denote the number of slippers.
The our objective is to maximize
With constraints
Machine A
Machine B
Plot the constrants we get the feasible region as shown below
The cornor points of the region are (4,0) , (3,3) and (0,4)
The maximum value of the objective function is at (3,3)
Hence the factory should manufacture 3 shoes and 3 slippers each day to get a profit of
Get Answers For Free
Most questions answered within 1 hours.