Question

Question: A factory manufactures shoes and slipper. It takes 1 hour of labour work on machine...

Question: A factory manufactures shoes and slipper. It takes 1 hour of labour work on machine A and 3 hours on machine B to produce a shoe. It takes 3 hours of
machine A and 1 hour on machine B to produce a slipper. A profit of Rs.20 per shoe and Rs 10 per slipper is earned. How many of each must be produced per
day so as to maximize the profit, if machines can be operated for maximum 12 hours per day?

Homework Answers

Answer #1

Let denote the number of shoes and denote the number of slippers.

The our objective is to maximize

With constraints

Machine A

Machine B

Plot the constrants we get the feasible region as shown below

The cornor points of the region are (4,0) , (3,3) and (0,4)

The maximum value of the objective function is at (3,3)

Hence the factory should manufacture 3 shoes and 3 slippers each day to get a profit of

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Problem 8. A company that manufactures shoes has three factories. Factory 1 produces 25% of the...
Problem 8. A company that manufactures shoes has three factories. Factory 1 produces 25% of the company's shoes, Factory 2 produces 60%, and Factory 3 produces 15%. One percent of the shoes produced by Factory 1 are mislabeled, 0.5% of those produced by Factory 2 are mislabeled, and 2% of those produced by Factory 3 are mislabeled. If you purchase one pair of shoes manufactured by this company, what is the probability that the shoes are mislabeled?
Use the information to complete the table. Each worker costs $12/hour and each machine costs $20/day...
Use the information to complete the table. Each worker costs $12/hour and each machine costs $20/day regardless of how many chairs are produced. Suppose the factory produces chairs 8 hours/day. Complete the table below. Wooden Chair Factory Number of Workers Number of Machines Output (chairs produced per hour) Marginal Product of Labor Cost of Workers Cost of Machines Total Cost 1 2 5 2 2 10 3 2 20 4 2 35 5 2 55 6 2 70 7 2...
A factory manufactures machines. Each machine is defective with probability 1/100, independently. The machines get numbered...
A factory manufactures machines. Each machine is defective with probability 1/100, independently. The machines get numbered 1, 2, . . . as they’re produced (a) Out of machines 1, . . . , 1000, what is the probability that none are defective? (b) Out of machines 1, . . . , 1000, what is the probability that two or fewer are defective? ( c) Out of machines 1, . . . , 1000, what is the probability that exactly ten...
1) A cottage industry manufactures pedestal lamps and wooden shades, each requiring the use of grinding/cutting...
1) A cottage industry manufactures pedestal lamps and wooden shades, each requiring the use of grinding/cutting machine and a sprayer. It takes 2 hours on the grinding/cutting machine and 3 hours on the sprayer to manufacture a pedestal lamp. It takes one hour on the grinding/cutting machine and 2 hours on the sprayer to manufacture a shade. On any day, the sprayer is available for at the most 20 hours and the grinding/cutting machine for at the most 12 hours....
RUSH RUSH Decision making technics.. A company uses two machines (Machine 1 and Machine 2) to...
RUSH RUSH Decision making technics.. A company uses two machines (Machine 1 and Machine 2) to produce product A. Each hour of operation, Machine 1 produces 50 products and Machine 2 produces 75. It cost the company $250/hour, and $325/hour to operate Machine 1 and Machine 2, respectively. Machine 2 has to produce at least 30% of all products. If the two machines [together] must produce at least 500 products each day and each machine can run for at most...
1. Which of the following is a period cost? Multiple Choice Depreciation of factory maintenance equipment....
1. Which of the following is a period cost? Multiple Choice Depreciation of factory maintenance equipment. Salary of the company's CFO. Cost of labor to assemble products in the production facility. Salary of factory supervisor. Omega Company reported the following information for the company's two products: Product X Product Y Selling price per unit $ 35 $ 25 Variable cost per unit 20 15 2. Assume that 75,000 machine hours are available; product X takes 4 machine hours to produce,...
Newjet Inc. manufactures two types of printers, an inkjet printer and a laser printer. The company...
Newjet Inc. manufactures two types of printers, an inkjet printer and a laser printer. The company can make a total of 70 printers per day, and it has 120 labor-hours per day available. It takes 1 labor-hour to make an inkjet printer and 3 labor-hours to make a laser printer. The profits are $40 per inkjet printer and $60 per laser printer. (Let x equal the number of ink jet printers. Let y equal the number of laser printers.) (a)...
1). Zapit, Inc. manufactures two products, Product A and Product B. Product A yields an incremental...
1). Zapit, Inc. manufactures two products, Product A and Product B. Product A yields an incremental profit of $2 per unit, and Product B yields an incremental profit of $4. Product A requires four hours of processing at Machine A and two hours at Machine B. Product B requires six hours at Machine A, six hours at Machine B, and one hour at Machine C. Machine A has a maximum of 120 hours of available capacity per day, Machine B...
Newjet, Inc. manufactures inkjet printers and laser printers. The company has the capacity to make 70...
Newjet, Inc. manufactures inkjet printers and laser printers. The company has the capacity to make 70 printers per day, and it has 120 hours of labor per day available. It takes 1 hour to make an inkjet printer and 3 hours to make a laser printer. The profits are $40 per inkjet printer and $90 per laser printer. Find the number of each type of printer that should be made to give maximum profit, and find the maximum profit. Inkjet...
A work center at the Mechanical Lyold Company has 4 machines and each machine is operated...
A work center at the Mechanical Lyold Company has 4 machines and each machine is operated 8.5 hours a day, 6 days a week. Last week, the work center operated for a total 158 hours and produced 140 hours of work. b. The following three jobs (A, B & C) are scheduled for a work center. Determine the total time in standard hours required to execute the jobs at the work center. Job A; order quantity= 150; run time per...