Question

During the process of producing toilet paper, Scott Paper randomly selects a toilet paper roll 5...

During the process of producing toilet paper, Scott Paper randomly selects a toilet paper roll 5 times throughout the day and subjects each roll to a stress test to see how often the paper tears. Over a 3-day period, the testing of 15 rolls found the following number of defectives in each roll: 2, 3, 1, 2, 3, 2, 3, 3, 1, 2, 2, 1, 2, 2 and 1.

Construct a control chart for the process. (Leave no cells blank - be certain to enter "0" wherever required. Round your answers to 2 decimal places.)

  Limits on the control chart are from ______ to _______ tears.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Scott Paper tests its toilet paper by subjecting 15 rolls to a wet stress test to...
Scott Paper tests its toilet paper by subjecting 15 rolls to a wet stress test to see whether and how often the paper tears during the test. Following are the number of defectives found over the last 15 days: 2, 3, 1, 2, 2, 1, 3, 2, 2, 1, 2, 2, 1, 0, and 0. 1. Calculate the CL, UCL, and LCL. 2. Construct a control chart for the process and comment on whether the process is \in control."
Scott is deciding which type of toilet paper to buy. There are two varieties of toilet...
Scott is deciding which type of toilet paper to buy. There are two varieties of toilet paper- a regular size (R) and a jumbo size (J) that has four times as many sheets per roll. Assume that Scott’s preferences for the two varieties can be expressed by the utility function U=1/4 R+J. (4 points each) Graph Scott’s indifference curves for U = 1 and U = 2 with R on the x-axis. What is Scott’s marginal rate of substitution of...
A shirt manufacturer buys cloth by the 100 yard roll from a supplier. For setting up...
A shirt manufacturer buys cloth by the 100 yard roll from a supplier. For setting up a control chart to manage the irregularities (e.g., loose threads and tears) the following data was collected from a sample provided by the supplier. SAMPLE 1 2 3 4 5 6 7 8 9 10 IRREGULARITIES 1 4 1 4 3 2 3 5 6 4 a. Determine the c¯c¯ , Sp, UCL and LCL for a c -chart with z= 2. (Leave no...
Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart...
Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart for control. The samples and the number of defectives in each are shown in the following table: SAMPLE n NUMBER OF DEFECTIVE ITEMS IN THE SAMPLE 1 15 1 2 15 1 3 15 3 4 15 1 5 15 0 6 15 0 7 15 2 8 15 1 9 15 2 10 15 1 a. Determine the p−p− , Sp, UCL and...
A bicycle manufacturer randomly selects 8 frames each day and tests for defects. The number of...
A bicycle manufacturer randomly selects 8 frames each day and tests for defects. The number of defective frames found over the last 14 days is 0, 2, 0, 3, 4, 4, 3, 0, 2, 2, 2, 1, 4, 2. A.) Determine the control limits for the process. (round to 1 decimal place) The control limits are from _________ to___________.
Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart...
Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart for control. The samples and the number of defectives in each are shown in the following table: SAMPLE n NUMBER OF DEFECTIVE ITEMS IN THE SAMPLE 1 15 0 2 15 2 3 15 0 4 15 3 5 15 1 6 15 3 7 15 1 8 15 0 9 15 0 10 15 0 a. Determine the p−p−, Sp, UCL and LCL...
Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart...
Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart for control. The samples and the number of defectives in each are shown in the following table: SAMPLE n NUMBER OF DEFECTIVE ITEMS IN THE SAMPLE 1 15 0 2 15 0 3 15 0 4 15 2 5 15 0 6 15 3 7 15 1 8 15 0 9 15 3 10 15 1 a. Determine the p−p−, Sp, UCL and LCL...
Edit question The results of inspection of samples of a product taken over the past 5...
Edit question The results of inspection of samples of a product taken over the past 5 days are given below. Sample size for each day has been 100: Day        1             2             3             4             5 Defectives           2             6             14           3             7 Determine the UCL for this chart Determine the LCL for this chart Is this process in control?
19,Suppose that you monitor the fraction defectives in ounces of a process that fills beer cans....
19,Suppose that you monitor the fraction defectives in ounces of a process that fills beer cans. The data given below were collected in the production process. Each day, 20 cans are inspected. What control chart would be the best for process monitoring? Calculate UCL and LCL of the relevant chart. Days     # of defectives 1   2 2   3 3       5 4       1 5   2 x-bar chart, UCL = 0.042 and LCL = 0 c chart, UCL = 0.1462...
A manufacturing company makes runners for cabinet drawers. To assess the quality of the manufacturing process,...
A manufacturing company makes runners for cabinet drawers. To assess the quality of the manufacturing process, the company collected one sample of 300 consecutively manufactured runners each day for 20 days and counted the number of defective items. The resulting sample data are: Sample:             1      2      3      4      5      6      7      8      9    10 Sample Size:   300 300 300 300 300 300 300 300 300 300 Defectives:        8       6     11    15    12    11     9      6      5      4 The Upper Control Limit, UCL, for a p control chart based on the above data is