Question

A cement truck delivers mixed cement to a large construction site. Let x represent the cycle...

A cement truck delivers mixed cement to a large construction site. Let x represent the cycle time in minutes for the truck to leave the construction site, go back to the cement plant, fill up, and return to the construction site with another load of cement. From past experience, it is known that the mean cycle time is μ = 40 minutes with σ = 19 minutes. The x distribution is approximately normal.

a) What is the probability that the cycle time will exceed 60 minutes, given that it has exceeded 50 minutes? (Round your answer to four decimal places.)

b) What is the probability that the cycle time will exceed 55 minutes, given that it has exceeded 40 minutes? (Round your answer to four decimal places.)

Homework Answers

Answer #1

Solution :

Given ,

mean = = 40

standard deviation = = 19

P(x > 50) = 1 - P(x<50 )

= 1 - P[(x -) / < (50-40) /19 ]

= 1 - P(z <0.53 )

Using z table

= 1 - 0.7019

=0.2981

probability= 0.2981

(b)

P(x > 40) = 1 - P(x<40 )

= 1 - P[(x -) / < (40-40) /19 ]

= 1 - P(z <0)

Using z table

= 1 - 0.5

=0.5

probability= 0.5

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A cement truck delivers mixed cement to a large construction site. Let x represent the cycle...
A cement truck delivers mixed cement to a large construction site. Let x represent the cycle time in minutes for the truck to leave the construction site, go back to the cement plant, fill up, and return to the construction site with another load of cement. From past experience, it is known that the mean cycle time is μ = 40 minutes with σ = 14 minutes. The x distribution is approximately normal. (b) What is the probability that the...
Let X represent the time it takes from when someone enters the line for a roller...
Let X represent the time it takes from when someone enters the line for a roller coaster until they exit on the other side. Consider the probability model defined by the cumulative distribution function given below. 0 x < 3 F(x) = (x-3)/1.08 3 < x < 4.08 1 x > 4.08 a) What is E(X)? Give your answer to three decimal places.   b) What is the value c such that P(X < c) = 0.78? Give your answer to...
Let x represent the dollar amount spent on supermarket impulse buying in a 10-minute (unplanned) shopping...
Let x represent the dollar amount spent on supermarket impulse buying in a 10-minute (unplanned) shopping interval. Based on a certain article, the mean of the x distribution is about $36 and the estimated standard deviation is about $7. (a) Consider a random sample of n = 40 customers, each of whom has 10 minutes of unplanned shopping time in a supermarket. From the central limit theorem, what can you say about the probability distribution of x, the average amount...
Quick Start Company makes 12-volt car batteries. After many years of product testing, the company knows...
Quick Start Company makes 12-volt car batteries. After many years of product testing, the company knows that the average life of a Quick Start battery is normally distributed, with a mean of 45.4 months and a standard deviation of 7.7 months. (a) If Quick Start guarantees a full refund on any battery that fails within the 36-month period after purchase, what percentage of its batteries will the company expect to replace? (Round your answer to two decimal places.) % (b)...
The taxi and takeoff time for commercial jets is a random variable x with a mean...
The taxi and takeoff time for commercial jets is a random variable x with a mean of 8.2 minutes and a standard deviation of 2.8 minutes. Assume that the distribution of taxi and takeoff times is approximately normal. You may assume that the jets are lined up on a runway so that one taxies and takes off immediately after the other, and that they take off one at a time on a given runway. (a) What is the probability that...
The amount of money spent weekly on cleaning, maintenance, and repairs at a large restaurant was...
The amount of money spent weekly on cleaning, maintenance, and repairs at a large restaurant was observed over a long period of time to be approximately normally distributed, with mean μ = $597 and standard deviation σ = $47. (a) If $646 is budgeted for next week, what is the probability that the actual costs will exceed the budgeted amount? (Round your answer to four decimal places.) (b) How much should be budgeted for weekly repairs, cleaning, and maintenance so...
The amount of money spent weekly on cleaning, maintenance, and repairs at a large restaurant was...
The amount of money spent weekly on cleaning, maintenance, and repairs at a large restaurant was observed over a long period of time to be approximately normally distributed, with mean μ = $629 and standard deviation σ = $44. (a) If $646 is budgeted for next week, what is the probability that the actual costs will exceed the budgeted amount? (Round your answer to four decimal places.)    (b) How much should be budgeted for weekly repairs, cleaning, and maintenance...
The amount of money spent weekly on cleaning, maintenance, and repairs at a large restaurant was...
The amount of money spent weekly on cleaning, maintenance, and repairs at a large restaurant was observed over a long period of time to be approximately normally distributed, with mean μ = $631 and standard deviation σ = $46. (a) If $646 is budgeted for next week, what is the probability that the actual costs will exceed the budgeted amount? (Round your answer to four decimal places.) (b) How much should be budgeted for weekly repairs, cleaning, and maintenance so...
The amount of money spent weekly on cleaning, maintenance, and repairs at a large restaurant was...
The amount of money spent weekly on cleaning, maintenance, and repairs at a large restaurant was observed over a long period of time to be approximately normally distributed, with mean μ = $617 and standard deviation σ = $42. (a) If $646 is budgeted for next week, what is the probability that the actual costs will exceed the budgeted amount? (Round your answer to four decimal places.) Incorrect: Your answer is incorrect. (b) How much should be budgeted for weekly...
Let x denote the time it takes to run a road race. Suppose x is approximately...
Let x denote the time it takes to run a road race. Suppose x is approximately normally distributed with a mean of 190 minutes and a standard deviation of 21 minutes. If one runner is selected at random, what is the probability that this runner will complete this road race in less than 205 minutes? Round your answer to four decimal places. P= #2 Let x denote the time it takes to run a road race. Suppose x is approximately...