Question

An industrial engineer is investigating the effect of four assembly methods (A, B, C, and D)...

An industrial engineer is investigating the effect of four assembly methods (A, B, C, and D) on the assembly time for a color television component. Four operators are selected for the study. Furthermore, the engineer knows that each assembly method produces such fatigue that the time required for the last assembly may be greater than the time required for the first, regardless of the method. To account for this source of variability, the engineer uses the design below.

explain the procedure of getting answers step-by-step.

Operator

Assembly order

1

2

3

4

1

C=10

D=14

A=7

B= 8

2

B=7

C=18

D=11

A=8

3

A=5

B=10

C=11

D=9

4

D=10

A= 10

B=12

C=14

  1. What test is appropriate for this design? Why?
  2. Analyze the data from this experiment using alpha=0.05.
  3. Draw appropriate conclusions.
  4. check the assumptions in this experiment.

Homework Answers

Answer #1

i tried my best i hope it will help you please give me positive rating

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
An industrial engineer is investigating the effect of four assembly methods (1, 2, 3, 4) on...
An industrial engineer is investigating the effect of four assembly methods (1, 2, 3, 4) on the assembly time for a color television component. Four operators are selected for the study. To account for the operator source of variability, the engineer uses the Randomized Complete Block Design shown below. Analyze the data from this experiment ( = 0.05) draw appropriate conclusions. Assembly Operator Method A B C D 1 5 10 7 8 2 7 10 12 8 3 12...
A plant has 4 operators to be assigned to four machines. the time (minutes) required by...
A plant has 4 operators to be assigned to four machines. the time (minutes) required by each worker to produce a product on each machine is shown in the following table" Determine the optimal assignemnt and compute total minimum time. Machine Operator A B C D Supply Assigned 1 0 0 1 0 1 2 1 0 0 0 1 3 0 1 0 0 1 4 0 0 0 1 1 Demand 1 1 1 1 4 Assigned Total...
Problem 12-09 (Algorithmic) A project has four activities (A, B, C, and D) that must be...
Problem 12-09 (Algorithmic) A project has four activities (A, B, C, and D) that must be performed sequentially. The probability distributions for the time required to complete each of the activities are as follows: Activity Activity Time (weeks) Probability A 7 0.30 8 0.31 9 0.23 10 0.16 B 5 0.16 7 0.57 9 0.27 C 8 0.11 10 0.20 12 0.35 14 0.22 16 0.12 D 12 0.60 14 0.40 Provide the base-case, worst-case, and best-case calculations for the...
Problem 12-09 (Algorithmic) A project has four activities (A, B, C, and D) that must be...
Problem 12-09 (Algorithmic) A project has four activities (A, B, C, and D) that must be performed sequentially. The probability distributions for the time required to complete each of the activities are as follows: Activity Activity Time (weeks) Probability A 7 0.30 8 0.31 9 0.23 10 0.16 B 5 0.16 7 0.57 9 0.27 C 8 0.11 10 0.20 12 0.35 14 0.22 16 0.12 D 12 0.60 14 0.40 Provide the base-case, worst-case, and best-case calculations for the...
A computer scientist is investigating the usefulness of two different design languages in improving programming tasks....
A computer scientist is investigating the usefulness of two different design languages in improving programming tasks. Twelve expert programmers, familiar with both languages, are asked to code a standard function in both languages, and the time (in minutes) is recorded. The data follow: Programmer Time Design Language 1 Design Language 2 1 17 18 2 17 14 3 21 20 4 14 11 5 18 23 6 24 21 7 15 10 8 14 13 9 21 19 10 23...
There are four persons A, B, C, D in a room, and one of them is...
There are four persons A, B, C, D in a room, and one of them is a foreign spy. Other three participants share a secret using the Shamir’s threshold scheme with secret in Zp, where p = 11. Any two of them can recover the secret. The foreign spy chooses his share randomly. As a result, these four participants have the following four shares: A : (1, 7), B : (3, 0), C : (5, 10), D : (7, 9)....
The following table indicates the supply schedules for four types of​ producers: ​A, B, C​, and...
The following table indicates the supply schedules for four types of​ producers: ​A, B, C​, and D and the number of producers in each group​ (top ​row). The quantity supplied by each type of producer ​(QA​, QB​, QC​, and QD​) is shown for market prices ranging from​ $8 down to​ $2. What is the combined quantity supplied at a market price of ​$77​? Number of producers A​ = 50 B​ = 60 C​ = 30 D​ = 20 Market Price...
Four municipalities (denoted A, B, C and D) decided to award nine $1000 scholarships to college...
Four municipalities (denoted A, B, C and D) decided to award nine $1000 scholarships to college students who reside in either of them. The following table shows the distribution of candidates per municipality. Municipality # of candidates 12 from municipality A, 13 from B, 14 from C and 11 from D, Total 50 Scholarships are drawn (without replacement) at random from the 50 college students. What is the probability that two students from the municipality A and 3 from the...
In a collaborative trial, four laboratories were sent samples from the same batch of a pharmaceutical...
In a collaborative trial, four laboratories were sent samples from the same batch of a pharmaceutical product and requested to perform ten assays and report the results based on percentage of a labeled amount of the drug. Physician Time A 9 A 12 A 10 A 7 A 11 A 13 A 8 A 13 B 10 B 6 B 7 B 10 B 11 B 9 B 9 B 11 C 8 C 9 C 12 C 10 C...
An educator wants to evaluate four different methods aimed at reducing the time children spend "off...
An educator wants to evaluate four different methods aimed at reducing the time children spend "off task" in the classroom. To test these methods, she implements one method in each of four similar classrooms and records the time spent off task (in minutes) in each classroom. The results are given in the table. Classroom Method A B C D 0 2 0 5 2 1 5 2 1 4 5 5 5 4 4 4 4 0 6 2 4...