Question

Day Units Inspected Units Defective 1 200 6 2 150 2 3 250 8 4 150...

Day Units Inspected Units Defective
1 200 6
2 150 2
3 250 8
4 150 0
5 200 3
6 200 4
7 250 9
8 150 1
9 250 7
10 150 2
11 100 1
12 250 6
13 200 4
14 100 0
15 250 7
16 100 1
17 200 5
18 200 3
19 250 10
20 200 4
21 200 4
22 100 0
23 250 7
24 200 4
25 100 1
26 200 3
27 250 8
28 250 5
29 250 7
30 250 6

A change in equipment results in a lower defective rate at the final inspection of soup cans. thirty days of data presented in the table below. (a) Find the trial p hat and control limits for the improved process. (b) Design a control chart for future production. Explain how to do this in minitab.

Homework Answers

Answer #1

Sol:


Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Question: 1. Based on the table, answer the following questions. (1) (2) (3) (4) (5) (6)...
Question: 1. Based on the table, answer the following questions. (1) (2) (3) (4) (5) (6) (7) K L Q MPK APK APL VMPK 0 20 0 - - - - 1 20 50 100 2 20 150 200 3 20 300 300 4 20 400 200 5 20 450 100 6 20 475 50 7 20 475 0 8 20 450 -50 9 20 400 -100 10 20 300 -200 11 20 150 -300 A firm’s product sells for...
Trials 1 2 3 4 5 6 Mass m(kg) 100 150 200 250 300 350 A(m)...
Trials 1 2 3 4 5 6 Mass m(kg) 100 150 200 250 300 350 A(m) 0.0248 0.0155 0.0306 0.0330 0.0312 0.0682 B(rad/s) 9.50 7.89 6.85 6.17 5.65 5.25 C(rad) 3.29 0.352 4.60 3.57 4.00 4.71 T(s) f (Hz) Question: Using your values of A, B, and C determine the frequency and period of oscillation. Record the period T and frequency f of this motion in your data table; show work.
Total Product Total Fixed Cost Total Variable Cost 0 $150 $   0 1 150 50 2...
Total Product Total Fixed Cost Total Variable Cost 0 $150 $   0 1 150 50 2 150 75 3 150 105 4 150 145 5 150 200 6 150 270 7 150 360 8 150 475 9 150 620 10 150 800 Based on the cost data given in the accompanying table, which of the price-quantity tables correctly represents the firm's short-run supply schedule? (a) (b) (c) (d) P Qs P Qs P Qs P Qs $20 1 $20 0...
A production manager at a Contour Manufacturing plant has inspected the number of defective plastic molds...
A production manager at a Contour Manufacturing plant has inspected the number of defective plastic molds in five random samples of 35 observations each. Following are the number of defective molds found in each sample: Construct a 3-sigma control chart (z = 3) with this information. (If the lower control limit is negative, round the LCL to zero and all other answers to 2 decimal places, e.g. 15.25.) CL: UCL: LCL: Sample Number of Defects Number of Observations in Sample...
exampleInput.txt 1 2 3 0 2 3 4 0 1 3 5 0 1 2 6...
exampleInput.txt 1 2 3 0 2 3 4 0 1 3 5 0 1 2 6 1 5 6 8 2 4 6 7 3 4 5 9 10 5 8 9 4 7 9 6 7 8 6 How can I detect when 'cin' starts reading from a new line. The amount of numbers in each row is unknown. I need them in type 'int' to use the data. Also, it will be executed like so, "./a.out < sampleInput.txt".
Refer to the following matrices. A = 1 −8 7 −3 −18 6 5 8 6...
Refer to the following matrices. A = 1 −8 7 −3 −18 6 5 8 6 0 5 8 3 4 8 −2     B = 4 −7 4 0 1 4 9 5 3 −3 0 9 C = 1 0 3 2 8     D = 1 9 −7 0 What is the size of each matrix? A     ____× ____ B     _____× _____ C     ____× ____ D     ____× _____
Given: Year 0 1 2 3 4 Project A $-350 $50 $100 $150 $200 Project B...
Given: Year 0 1 2 3 4 Project A $-350 $50 $100 $150 $200 Project B $-250 $125 $100 $75 $50 Hurdle rate = 10%, Use incremental IRR analysis to decide whether you should take project A instead of project B.
Let p = (8, 10, 3, 11, 4, 0, 5, 1, 6, 2, 7, 9) and...
Let p = (8, 10, 3, 11, 4, 0, 5, 1, 6, 2, 7, 9) and let q = (2, 4, 9, 5, 10, 6, 11, 7, 0, 8, 1, 3) be tone rows. Verify that p = Tk(R(I(q))) for some k, and find this value of k.
A factory tracks the number of defective products in lots of size 200, they look at...
A factory tracks the number of defective products in lots of size 200, they look at a lot of 200 several times a week. What kind of control chart should be constructed? The last 12 days have found defective counts of 3, 4, 0, 2, 0, 3, 5, 1, 2, 2, 3, 0; what are the control limits for the process? Draw the appropriate control chart. Is the process in control? (10 pts)
price quantity marginal revenue $8 0 $7 1 $6 2 $5 3 $4 4 $3 5...
price quantity marginal revenue $8 0 $7 1 $6 2 $5 3 $4 4 $3 5 $2 6 $1 7 a monopolist firm sees the following demand, find the marginal revenue. Here's the same firm cost schedule find the marginal cost and based off of the data in these 2 find the monopolist equilibrium quantity and price. quantity total variable cost marginal cost 1 $5 2 $9 3 $12 4 $14 5 $18 6 $24 7 $32 8 $42
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT