Question

A bicycle manufacturer randomly selects 8 frames each day and tests for defects. The number of...

A bicycle manufacturer randomly selects 8 frames each day and tests for defects. The number of defective frames found over the last 14 days is 0, 2, 0, 3, 4, 4, 3, 0, 2, 2, 2, 1, 4, 2.

A.) Determine the control limits for the process. (round to 1 decimal place)

The control limits are from _________ to___________.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
During the process of producing toilet paper, Scott Paper randomly selects a toilet paper roll 5...
During the process of producing toilet paper, Scott Paper randomly selects a toilet paper roll 5 times throughout the day and subjects each roll to a stress test to see how often the paper tears. Over a 3-day period, the testing of 15 rolls found the following number of defectives in each roll: 2, 3, 1, 2, 3, 2, 3, 3, 1, 2, 2, 1, 2, 2 and 1. Construct a control chart for the process. (Leave no cells blank...
A factory tracks the number of defective products in lots of size 200, they look at...
A factory tracks the number of defective products in lots of size 200, they look at a lot of 200 several times a week. What kind of control chart should be constructed? The last 12 days have found defective counts of 3, 4, 0, 2, 0, 3, 5, 1, 2, 2, 3, 0; what are the control limits for the process? Draw the appropriate control chart. Is the process in control? (10 pts)
Lemon Corporation, an automobile manufacturer, is trying to determine the source of defects in some of...
Lemon Corporation, an automobile manufacturer, is trying to determine the source of defects in some of its autos. Rumor has it that on Mondays large numbers of Lemon auto workers are hung over from a weekend of debauchery and are, therefore, more likely to make mistakes on the job.  In order to test the hypothesis of more defects on Mondays, the company draws a random sample of 400 automobiles made by Lemon in the last two years.   In this sample, they...
Problem 3 (14 Marks) A manufacturer wants to compare the number of defects on the day...
Problem 3 A manufacturer wants to compare the number of defects on the day shift with the number on the evening shift. A sample of production from recent shifts showed the following defects: Day Shift                     4          7          6          5          8          6 Evening Shift              7          9          6          10        8          11        13        8 The objective is to determine whether the mean number of defects on the night shift is greater than the mean number on the day shift at the 95%...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of 14 ounces. Use Table 1 in Appendix B. The process standard deviation is 0.15, and the process control is set at plus or minus 1 standard deviation. Units with weights less than 13.85 or greater than 14.15 ounces will be classified as defects. What is the probability of...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of 10 ounces. The process standard deviation is 0.1, and the process control is set at plus or minus 2 standard deviations. Units with weights less than 9.8 or greater than 10.2 ounces will be classified as defects. What is the probability of a defect (to 4 decimals)? In...
Day Units Inspected Units Defective 1 200 6 2 150 2 3 250 8 4 150...
Day Units Inspected Units Defective 1 200 6 2 150 2 3 250 8 4 150 0 5 200 3 6 200 4 7 250 9 8 150 1 9 250 7 10 150 2 11 100 1 12 250 6 13 200 4 14 100 0 15 250 7 16 100 1 17 200 5 18 200 3 19 250 10 20 200 4 21 200 4 22 100 0 23 250 7 24 200 4 25 100 1...
The table lists the number of defective 60-watt lightbulbs found in samples of 100 bulbs selected...
The table lists the number of defective 60-watt lightbulbs found in samples of 100 bulbs selected over 25 days from a manufacturing process. Assume that during this time the manufacturing process was not producing an excessively large fraction of defectives. Day 1 2 3 4 5 6 7 8 9 10 Defectives 5 3 5 8 4 5 4 6 6 2 Day 11 12 13 14 15 16 17 18 19 20 Defectives 3 5 4 4 1 2...
The table lists the number of defective 60-watt lightbulbs found in samples of 100 bulbs selected...
The table lists the number of defective 60-watt lightbulbs found in samples of 100 bulbs selected over 25 days from a manufacturing process. Assume that during this time the manufacturing process was not producing an excessively large fraction of defectives. Day 1 2 3 4 5 6 7 8 9 10 Defectives 5 2 6 8 4 4 5 6 7 2 Day 11 12 13 14 15 16 17 18 19 20 Defectives 2 5 3 4 1 3...
Scott Paper tests its toilet paper by subjecting 15 rolls to a wet stress test to...
Scott Paper tests its toilet paper by subjecting 15 rolls to a wet stress test to see whether and how often the paper tears during the test. Following are the number of defectives found over the last 15 days: 2, 3, 1, 2, 2, 1, 3, 2, 2, 1, 2, 2, 1, 0, and 0. 1. Calculate the CL, UCL, and LCL. 2. Construct a control chart for the process and comment on whether the process is \in control."