Question

I am asking how we can model that question detailly in Arena. All information is below....

I am asking how we can model that question detailly in Arena. All information is below. There is similiar question and answers in chegg, but these answers are not enough to model in Arena.

Two different part types arrive at a facility for processing. Parts of Type 1 arrive with interarrival times following a lognormal distribution with a log mean of 11.5 hours and log standard deviation of 2.0 hours (note that these values are the mean and standard deviation of this lognormal random variable itself); the first arrival is at time 0. These arriving parts wait in a queue designated for only Part Type 1’s until a (human) operator is available to process them (there is only one such human operator in the facility) and the processing times follow a triangular distribution with parameters 5, 6, and 8 hours. Parts of Type 2 arrive with interarrival times of an exponential distribution with mean of 15.1 hours; the first arrival is at time 0. These parts wait in a second queue (designated for Part Type 2’s only) until the same lonely (human) operator is available to process them; processing times follow a triangular distribution with parameters 3, 7, and 8 hours. After being processed by the human operator, all parts are sent for processing to an automatic machine not requiring a human operator, which has processing times distributed as triangular with parameters of 4, 6, and 8 hours for part type 1 and triangular with parameters of 3, 5 and 7 hours for part type 2. All parts share the same first- come, first-served queue for this automatic machine. After being processed by the automatic machine, 92% of the the parts are ready to sent to market place, and 8% of them cannot satisfy quality standards, hence they are sent to garbage. Assume that the times for all part transfers are negligible. Run simulation for 5000 hours to determine the average total time in system (sometimes called cycle time) base on part type. Determine the cycle time for items sent to garbage and market, separately. Determine the average number of items in the queues designated for the arriving part.

Homework Answers

Answer #1

The Simulation Model of the workstation :-

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
In Model 3-1, suppose that instead of having a single source of parts, there are three...
In Model 3-1, suppose that instead of having a single source of parts, there are three sources of arrival, one for each of three different kinds of parts that arrive: blue (as before), Green, and Red. For each color of arriving part, inter-arrival times are exponentially distributed with a mean of 16 minutes. Run the simulation for 480 minutes, and compute the same performance measures as for Model 3-1. Once the parts are in the system, they retain their correct...
Items arrive from an inventory-picking system according to an exponential inter-arrival with mean of 1.5 (all...
Items arrive from an inventory-picking system according to an exponential inter-arrival with mean of 1.5 (all times are in minutes), with the first arrival at time 0. Upon arrival the items are packed by one of four identical packers, with a single queue “feeding” all four packers. The packing time is TRIA (2.5, 3, 4.5). Packed boxes are then separated by type (20%, international and 80% domestic), and sent to shipping. There is a single shipper for international packages and...
Please answer the following Case analysis questions 1-How is New Balance performing compared to its primary...
Please answer the following Case analysis questions 1-How is New Balance performing compared to its primary rivals? How will the acquisition of Reebok by Adidas impact the structure of the athletic shoe industry? Is this likely to be favorable or unfavorable for New Balance? 2- What issues does New Balance management need to address? 3-What recommendations would you make to New Balance Management? What does New Balance need to do to continue to be successful? Should management continue to invest...