Question

A manufacturing process is designed to produce a part with an average length of 450 millimeters....

A manufacturing process is designed to produce a part with an average length of 450 millimeters. A random sample of 20 parts has an average length of 443 millimeters and a standard deviation of 22 millimeters. Use a statistical test at a 0.05 level of significance to decide if the average part length is different from the designed one. State any assumptions you are making.

Homework Answers

Answer #1

Solution :

The null and alternative hypothesis is ,

H0 :   = 450

Ha :    450

= 443

s = 22

n = 20

degrees of freedom = n - 1 = 20 - 1 = 19

Test statistic = t =

= ( - ) / s / n

= (443 - 450) / 22 / 20

Test statistic = t = -1.42

This is the two tailed test,

P( t < -1.42 )

= 0.0859

P-value = 2 * P( t < -1.42 )

P-value = 2 * 0.0859

P-value = 0.1718

= 0.05  

P-value >

Fail to reject the null hypothesis

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
You are working on a manufacturing process that should produce products that have a diameter of...
You are working on a manufacturing process that should produce products that have a diameter of 3/4 of an inch. You take a random sample of 35 products and find the diameter to be 13/16 of an inch with a standard deviation of 5/32 of an inch. Considering a 5% level of significance, what can you state statistically about the process? Please include a null hypothesis, an alternative hypothesis, and use an appropriate test statistic (i.e. ZSTAT or tSTAT).
Exercise 5 A soap manufacturing process is designed to produce a mean of 125 bars. A...
Exercise 5 A soap manufacturing process is designed to produce a mean of 125 bars. A sample of 10 batches shows the following number of bars of soaps. 108 118 120 122 119 113 124 122 120 123. Use alpha 0.05 to test whether the mean number of soaps is less than 125. Show all the five steps of the hypothesis testing.
A metal casting process is designed to produce parts with a specified weight of 2.1 ounces....
A metal casting process is designed to produce parts with a specified weight of 2.1 ounces. A sample of 30 parts yields a sample mean weight of 2.084 ounces. The researcher assumes that the process standard deviation is .05 ounces and is looking for evidence at the .05 level that the process is producing parts that are not 2.1 ounces on average. Find: A. Hypothesis B. Test Statistic C. P-value D. Decision E. Which of the following correctly describes the...
The time it takes to produce a certain part in a high-tech manufacturing process is uniformly...
The time it takes to produce a certain part in a high-tech manufacturing process is uniformly distributed between 4 and 8 minutes. Use the following random numbers to simulate the production time for 10 parts and answer the questions below. 0.82, 0.63, 0.02, 0.91, 0.44, 0.18, 0.12, 0.67, 0.80, 0.09 Part Production Time 1 2 3 4 5 6 7 8 9 10 a) According to this simulation, what is the shortest production time? b) According to this simulation, what...
The time it takes to produce a certain part in a high-tech manufacturing process is uniformly...
The time it takes to produce a certain part in a high-tech manufacturing process is uniformly distributed between 4 and 8 minutes. Use the following random numbers to simulate the production time for 10 parts and answer the questions below. 0.82, 0.63, 0.02, 0.91, 0.44, 0.18, 0.12, 0.67, 0.80, 0.09 Part Production Time 1 2 3 4 5 6 7 8 9 10 a) According to this simulation, what is the shortest production time? b) According to this simulation, what...
When operating normally, a manufacturing process produces tablets for which the mean weight of the active...
When operating normally, a manufacturing process produces tablets for which the mean weight of the active ingredient is 5 grams, and the standard deviation is 0.025 gram. For a random sample of 12 tables the following weights of active ingredient (in grams) were found: 5.01 4.69 5.03 4.98 4.98 4.95 5.00 5.00 5.03 5.01 5.04 4.95 Without assuming that the population variance is known, test the null hypothesis that the population mean weight of active ingredient per tablet is 5...
A manufacturing process is designed to produce cylinder heads with a wall thickness that follows a...
A manufacturing process is designed to produce cylinder heads with a wall thickness that follows a normal distribution with a mean wall thickness of 0.22 inches and a standard deviation of 0.01 inches. The following table contains values of measured wall thicknesses produced by the process. Assume the standard deviation of the process is always 0.01 inches. 0.223, 0.228, 0.214, 0.193, 0.223, 0.213, 0.218, 0.233, 0.201, 0.223, 0.224, 0.231, 0.237, 0.204, 0.226, 0.219 a) What are appropriate null and alternative...
The process that makes the spaghetti noodles for Delectable Delights is supposed to produce noodles with...
The process that makes the spaghetti noodles for Delectable Delights is supposed to produce noodles with an average length of 252 mm.   Allison, the Quality Control Manager, is concerned that Machine #42 is not working properly and the noodles it produces are too short. You are asked to take a random sample of 40 noodles from Machine #42 and perform a hypothesis test to determine if the noodles produced by the machine are, on average, less than 252 mm. Use...
Previous experience shows the standard deviation of a given process to be 3.7. A manufacturing engineer...
Previous experience shows the standard deviation of a given process to be 3.7. A manufacturing engineer is concerned that the standard deviation has changed. a) State the Hypothesis to show the standard deviation of the process has changed? b) To test the hypothesis, the manufacturing engineer takes a random sample of 12 from the process and records the variable of interest. The data appear in the Process worksheet of the Hypothesis Tests HW data workbook on Moodle. Use JMP to...
A large manufacturing plant has analyzed the amount of time required to produce an electrical part...
A large manufacturing plant has analyzed the amount of time required to produce an electrical part and determined that the times follow a normal distribution with mean time μ = 45 hours. The production manager has developed a new procedure for producing the part. He believes that the new procedure will decrease the population mean amount of time required to produce the part. After training a group of production line workers, a random sample of 25 parts will be selected...