Question

The following sample of lengths was taken from 9 rods off the assembly line. Construct the...

The following sample of lengths was taken from 9 rods off the assembly line. Construct the 99% confidence interval for the population standard deviation for all rods that come off the assembly line. Round your answers to two decimal places.

13.6,13.8,14.1,13.6,13.3,13.5,13.9,13.3,14.1

Homework Answers

Answer #1

From the given sample data : n=9 , ,

The sample standard deviation is ,

Now ,

The Excel function is , =CHIINV(0.995,8)

The Excel function is , =CHIINV(0.005,8)

Therefore , the 99% confidence interval for the population standard deviation for all rods that come off the assembly line is ,

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The following sample of diameters was taken from 8 cans off the assembly line. Construct the...
The following sample of diameters was taken from 8 cans off the assembly line. Construct the 99% confidence interval for the population standard deviation for all cans that come off the assembly line. Round your answers to two decimal places. 9.7,9.8,9.4,9.0,8.8,9.1,9.2,8.8
The following sample of diameters was taken from 8 cans off the assembly line. Construct the...
The following sample of diameters was taken from 8 cans off the assembly line. Construct the 99% confidence interval for the population standard deviation for all cans that come off the assembly line. Round your answers to two decimal places. 9.7,9.8,9.4,9.0,8.8,9.1,9.2,8.8
The following sample of weights was taken from 8cookies off the assembly line. Construct the 95%...
The following sample of weights was taken from 8cookies off the assembly line. Construct the 95% confidence interval for the population variance for all cookies that come off the assembly line. Round your answers to two decimal places. 9.6,10.2,10.3,9.2,9.5,10.1,9.2,9.4
A manufacturer randomly tests 150 items off of its assembly line and finds that 9 are...
A manufacturer randomly tests 150 items off of its assembly line and finds that 9 are defective. What is the lower bound for a 95% confidence interval for the proportion of all defective items produced of that assembly line? Round to at least 3 decimal places.
a sample of 49 observations is taken from a normal population with a standard deviation of...
a sample of 49 observations is taken from a normal population with a standard deviation of 10. The sample mean is 55. Determine the 99% confidence interval for the population mean. ( round you answers 2 decimal places)
Let the following sample of 8 observations be drawn from a normal population with unknown mean...
Let the following sample of 8 observations be drawn from a normal population with unknown mean and standard deviation: 16, 26, 20, 14, 23, 10, 12, 29. [You may find it useful to reference the t table.] a. Calculate the sample mean and the sample standard deviation. (Round intermediate calculations to at least 4 decimal places. Round "Sample mean" to 3 decimal places and "Sample standard deviation" to 2 decimal places.) b. Construct the 95% confidence interval for the population...
The following results come from two independent random samples taken of two populations. Sample 1 Sample...
The following results come from two independent random samples taken of two populations. Sample 1 Sample 2 n1 = 60 n2 = 35 x1 = 13.6 x2 = 11.6 σ1 = 2.3 σ2 = 3 (a) What is the point estimate of the difference between the two population means? (Use x1 − x2.) (b) Provide a 90% confidence interval for the difference between the two population means. (Use x1 − x2. Round your answers to two decimal places.) to (c)...
The mean time taken to design a house plan by 40 architects was found to be...
The mean time taken to design a house plan by 40 architects was found to be 19 hours with a standard deviation of 3.10 hours. a. Construct a 99% confidence interval for the population mean μ . Round your answers to two decimal places. ______to _____ hours b. Suppose the confidence interval obtained in part a is too wide. Select all of the ways the width of this interval can be reduced. -Lowering the sample size -Increasing the sample size...
Construct 90%, 95%, and 99% confidence intervals to estimate μ from the following data. State the...
Construct 90%, 95%, and 99% confidence intervals to estimate μ from the following data. State the point estimate. Assume the data come from a normally distributed population. 12.3 11.6 11.9 12.1 12.5 11.4 12.0 11.7 11.8 12.3 (Round the intermediate values to 4 decimal places. Round your answers to 2 decimal places.) 90% confidence interval:_____________ ≤ μ ≤ _____________ 95% confidence interval: ____________ ≤ μ ≤ _____________l   99% confidence interval: ____________ ≤ μ ≤ _____________ The point estimate is_________.
The lengths of steel rods produced by a shearing process are normally distributed. A random sample...
The lengths of steel rods produced by a shearing process are normally distributed. A random sample of 10 rods is selected; the sample mean length is 119.05 inches; and the sample standard deviation is 0.10 inch. The 90% confidence interval for the population mean rod length is __________. Select one: A. 118.99 to 119.11 B. 118.57 to 119.23 C. 119.00 to 119.30 D. 118.89 to 119.51