Question

The specification for a plastic liner for concrete highway projects calls for a thickness of 6.0...

The specification for a plastic liner for concrete highway projects calls for a thickness of 6.0 mm ± 0.1 mm. The standard deviation of the process is estimated to be 0.02 mm. Q4b. The process is known to operate at a mean thickness of 6.03 mm. What is the Cp and Cpk for this process?

Homework Answers

Answer #1

the specification limit is :-

needed data are:-

the Cp for this process is :-

the needed calculations are:-

the Cpk for this process is :-

*** if you have any doubt regarding the problem ,please write it in the comment box...if satisfied,please UPVOTE.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A process in control has an estimated standard deviation of 2 mm. The product produced by...
A process in control has an estimated standard deviation of 2 mm. The product produced by this process has specification limits of 120 ± 8 mm and a target value of 120 mm. Calculate the process capability indices Cp and Cpk for the process if the process mean shifts from 118 mm first to 122 mm and then to 124 mm, but the process variability remains the same. What will be the yield of the process for each of three...
A process that manufactures glass sheets is supposed to be calibrated so that the mean thickness...
A process that manufactures glass sheets is supposed to be calibrated so that the mean thickness  of the sheets is more than 4 mm. The standard deviation of the sheet thicknesses is known to be well approximated by σ = 0.20 mm. Thicknesses of each sheet in a sample of sheets will be measured, and a test of the hypothesis H_0:μ≤4 versus H_1:μ>4 will be performed. Assume that, in fact, the true mean thickness is 4.04 mm. a) If...
A certain process for manufacturing screws whose nominal diameter is 4.70 mm. Historically the process standard...
A certain process for manufacturing screws whose nominal diameter is 4.70 mm. Historically the process standard deviation is known to be 0.05mm. Measurements are taken on a sample with the intention of evaluating the process mean. The results were the following: d. What is the probability of making a type I error? EXPLAIN e. If the screw thickness specifications are: 4.70 + 0.10 i. What proportion of the screws are out of specification? Will this proportion affect the sample size?...
The highway department is testing two types of reflecting paint for concrete bridge end pillars. The...
The highway department is testing two types of reflecting paint for concrete bridge end pillars. The two kinds of paint are alike in every respect except that one is orange and the other is yellow. The orange paint is applied to 12 bridges, and the yellow paint is applied to 12 bridges. After a period of 1 year, reflectometer readings were made on all these bridge end pillars. (A higher reading means better visibility.) For the orange paint, the mean...
The highway department is testing two types of reflecting paint for concrete bridge end pillars. The...
The highway department is testing two types of reflecting paint for concrete bridge end pillars. The two kinds of paint are alike in every respect except that one is orange and the other is yellow. The orange paint is applied to 12 bridges, and the yellow paint is applied to 12 bridges. After a period of 1 year, reflectometer readings were made on all these bridge end pillars. (A higher reading means better visibility.) For the orange paint, the mean...
The highway department is testing two types of reflecting paint for concrete bridge end pillars. The...
The highway department is testing two types of reflecting paint for concrete bridge end pillars. The two kinds of paint are alike in every respect except that one is orange and the other is yellow. The orange paint is applied to 12 bridges, and the yellow paint is applied to 12 bridges. After a period of 1 year, reflectometer readings were made on all these bridge end pillars. (A higher reading means better visibility.) For the orange paint, the mean...
Solutions for this exercise will not be posted. However, it is possible that questions from this...
Solutions for this exercise will not be posted. However, it is possible that questions from this exercise could appear on Midterm II. DEFINE ALL NOTATION!!!!! 1. Here is a pdf: . a) How do you know it is a continuous distribution? b) The constant a is positive. What is a? c) What is probability that the random variable X is equal to 1? d) What is F(-0.5)? e) What is the cdf of the random variable X? f) What is...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT