Question

The General Widgets Company (GWC) is interested in setting up x-bar and R charts, both with...

The General Widgets Company (GWC) is interested in setting up x-bar and R charts, both with 3 sigma control limits on the net weight of a 100 ounce widget. They have collected 100 samples using the sample size of 9 and found that ?̿=99.95 and ?̅=1.3464. However, they are planning on switching to a sample of size 4. a)Set up the x-bar chart for a sample of size 4. b)Set up the R chart for a sample of size 4. c)What is the average number of samples inspected before a false alarm on either the new x-bar chart or R chart?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The General Widgets Company (GWC) is currently using the x-bar chart and s-chart, both with 3...
The General Widgets Company (GWC) is currently using the x-bar chart and s-chart, both with 3 control limits on the net weight of a 50 ounce widget. In constructing these two charts, they have collected 100 samples using the sample size of 5 and found that ?̿ = 49.95 and ? ̅ = 4.652. However, they plan on switching to a sample of size 10. a)Set up an x-bar chart for a sample of size 10. b)Set up an s...
Control charts for x bar and R with subgroup size=4 are used to monitor a normally...
Control charts for x bar and R with subgroup size=4 are used to monitor a normally distributed quality characteristic. The control charts parameter were: X bar chart UCL=813, x bar chart CL=800, x bar chart LCL=787. R chart UCL=46.98, R chart CL=20.59, R chart LCL=0, both charts exhibit control. If the process mean shift from 800 to 780. What is the probability of detecting this shift on or before the second sample? A. 0.9934 B. 0.9834 C. 0.9993 D. 0.9894...
The Slip-Ring Diameters (cm) – Each Sample consisted of 5 Observations to Calculate the X-Bar and...
The Slip-Ring Diameters (cm) – Each Sample consisted of 5 Observations to Calculate the X-Bar and R-Bar CONTROL Charts for each of the Sample Size. PRESUME each Sample Consisted of 8 Observations AND HAD THE SAME X-BAR & R-BAR AVERAGES!! (Slide 4-29; 2 RightHand Columns ONLY!!) Calculate Upper and Lower Control Limits for X-Bar R-Bar Graph the CONTROL Charts with the 10 Data Samples X-Bar R-Bar
Suppose you calculate “X bar bar” = 25 and “R bar” = 7.5 from 25 previous...
Suppose you calculate “X bar bar” = 25 and “R bar” = 7.5 from 25 previous samples of size 5 each. Assume the quality characteristic has a normal distribution and both the “X bar” and R charts show statistical control of the process. Specification limits are at 24 ± 7.    c) Calculate the percentage of items outside the specification limits.   d) Calculate the capability index. Comment on the capability of the process.
1.     T F Sometimes the interquartile range is used in establishing x bar charts 2.     T...
1.     T F Sometimes the interquartile range is used in establishing x bar charts 2.     T F The selection of the equation to determine the probability of accepting a sample is partially based on the size of the sample. 3.     T F R charts may be used in place of S charts to control the variability of a measurement 4.     T F If I was interested in the control of the number of defects on a particular product, I would...
A hospital is using X bar and R charts to record the time it takes to...
A hospital is using X bar and R charts to record the time it takes to process account information. A sample of five applications is taken each day. The first four weeks’ (20 days’) data give the following values: X-double bar= 17 min, R bar = 7 min. If the upper and lower specification limits are 21 minutes and 13 minutes respectively, calculate Cp and Cpk. Interpret the indices
Below are X-bar and R values for 12 samples of size = 5. They are taken...
Below are X-bar and R values for 12 samples of size = 5. They are taken from a process producing bearings. The measurements are made on the inside diameter of the bearing. The data have been coded from 0.50; in other words, a measurement of 0.50345 has been recorded as 345. Range values are coded from 0.000; that is, 0.00013 is recorded as 13. Subgroup Number X-bar Range 1 145 13 2 147 14 3 150 12 4 146 11...
What are the control limits for an x-bar control charts with α=0.004 probability limit and a...
What are the control limits for an x-bar control charts with α=0.004 probability limit and a sample size of 4? Assume that ? is the process standard deviation, and the mean shift is also ?. What is the type II error under this mean shift?
The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen...
The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen samples of five completed mortgage transactions each were taken during a period when the process was believed to be in control. The times to complete the transactions were measured. The means and ranges of the mortgage process transaction​ times, measured in​ days, are as​ follows:                                                                                                                                                  Sample 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Mean 19...
ProCycle & Co. uses X bar and R-charts to track the thickness of bicycle brake pads...
ProCycle & Co. uses X bar and R-charts to track the thickness of bicycle brake pads in millimeters. Below are the observations for 5 samples. What are the UCLR , LCLR (for range) and X bar (double bar)? Sample Observation 1 Observation 2 Observation 3 1 22 14 12 2 24 17 18 3 19 20 21 4 16 13 15 5 10 10 13 Group of answer choices 7.722: 0: 81.34 9.575: 0: 81.34 7.222: 0: 81.34 12.87; 0:...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT