Calculate the Average Run Length (ARL0) when the process is in control for an top enclose x-chart designed to have a sigma level of 1.61?
Answer:
Given that:
Calculate the Average Run Length () when the process is in control for an top enclose x-chart designed to have a sigma level of 1.61?
Average Run Length () is the average number of subgroups before an out of control condition is identified in control chart
When the process is in control
Get Answers For Free
Most questions answered within 1 hours.