Reducing scrap of 4-foot planks of hardwood is an important factor in reducing cost at a wood-flooring manufacturing company. Accordingly, engineers at Lumberworks are investigating a potential new cutting method involving lateral sawing that may reduce the scrap rate. To examine its viability, samples of 500 and
400 planks, respectively, were examined under the old and new methods. Sixty-three of the 500 planks were scrapped under the old method, whereas 30 of the 400 planks were scrapped under the new method. Construct the 99% confidence interval for the difference between the population scrap rates between the old and new methods, respectively
old method | New Method | |
x= | 63 | 30 |
n = | 500 | 400 |
p̂=x/n= | 0.1260 | 0.0750 |
estimated diff. in proportion=p̂1-p̂2= | 0.0510 |
Se =√(p̂1*(1-p̂1)/n1+p̂2*(1-p̂2)/n2) = | 0.0198 |
for 99 % CI value of z= | 2.576 | from excel:normsinv((1+0.99)/2) | |
margin of error E=z*std error = | 0.051108 | ||
lower bound=(p̂1-p̂2)-E= | -0.0001 | ||
Upper bound=(p̂1-p̂2)+E= | 0.1021 | ||
from above 99% confidence interval for difference in population proportion =(-0.0001, 0.1021) |
Get Answers For Free
Most questions answered within 1 hours.