Question

A pizza place recently hired additional drivers and as a result now claims that its average...

A pizza place recently hired additional drivers and as a result now claims that its average delivery time for orders is under 45 minutes. A sample of 41 customer deliveries was​ examined, and the average delivery time was found to be 41.5 minutes.​ Historically, the standard deviation for delivery time is 10.7 minutes. Using alphaequals0.10​,

A. determine the p-value for this test using excel steps

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A pizza place recently hired additional drivers and as a result now claims that its average...
A pizza place recently hired additional drivers and as a result now claims that its average delivery time for orders is under 45 minutes. A sample of 39 customer deliveries was? examined, and the average delivery time was found to be 41.9 minutes.? Historically, the standard deviation for delivery time is 10.6 minutes. Using ? = 0.10?, complete parts a-c z-test statistic= critical z-score= p-value=
A pizza place recently hired additional drivers and as a result now claims that its average...
A pizza place recently hired additional drivers and as a result now claims that its average delivery time for orders is under 44 minutes. A sample of 43 customer deliveries was​ examined, and the average delivery time was found to be 40.5 minutes.​ Historically, the standard deviation for delivery time is 11.1 minutes. Using a significance level of 0.10 A. The​ z-test statistic is = (round to two decimal places) B. The critical z-score is= (round to two decimal places)...
A pizza place recently hired additional drivers and as a result now claims that its average...
A pizza place recently hired additional drivers and as a result now claims that its average delivery time for orders is under 45 minutes. A sample of 40 customer deliveries was​ examined, and the average delivery time was found to be 40.2 minutes.​ Historically, the standard deviation for delivery time is 10.5 minutes. Using alpha=0.01​, complete parts a and b below. a. Does this sample provide enough evidence to support the delivery time claim made by the pizza​ place? Determine...
John Pizza Restaurant is facing a stiff competition from the new competing pizza restaurant guaranteeing pizza...
John Pizza Restaurant is facing a stiff competition from the new competing pizza restaurant guaranteeing pizza deliveries within 32 minutes or the pizza is given free. To answer this challenge, Maldini wants to offer a 30-minute delivery guarantee. After a careful cost analysis, Maldini has determined that such a guarantee would require an average delivery time of less than 27 minutes. She thought that this would limit the percentage of ‘free pizzas’ under the guarantee to less than 8% of...
A local pizza place claims that they average a delivery time of 7.32 minutes. To test...
A local pizza place claims that they average a delivery time of 7.32 minutes. To test this claim, you order 11 pizzas over the next month at random times on random days of the week. You calculate the average delivery time and sample standard deviation from the 11 delivery times (minutes), and with the sample mean and sample standard deviation of the time (minutes), you create a 95% confidence interval of (7.648, 9.992). (delivery time is normally distributed) a. What...
Tombro Industries is in the process of automating one of its plants and developing a flexible...
Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months:    Month 1 2 3 4 Quality...
Tombro Industries is in the process of automating one of its plants and developing a flexible...
Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months: Month 1 2 3 4 Quality control...
for the scenario below: 1) Apply the qualitative analysis by identifying at least 3 issues in...
for the scenario below: 1) Apply the qualitative analysis by identifying at least 3 issues in the above process. Analyse these issues by using a. Adding-value and Waste Analysis b. Issue register, If you find that there are more than three issues, you can focus on the three issues that have the highest impact. 2). Calculate the cycle time efficiency of the as-is process. You can assume a working week of 40 hours. In case there is missing information, you...
Penner Medical Products On Monday, April 14, Neil Bennett, Warehouse Manager at Penner Medical Products (Penner)...
Penner Medical Products On Monday, April 14, Neil Bennett, Warehouse Manager at Penner Medical Products (Penner) in Rockford Illinois, was concerned about rising costs and delays associated with shipments arriving from an important Canadian supplier, Stinson Distribution Company. Ken McCallum, General Manager of Penner has asked Bennett to review and analysis the situation and report back to him with recommendations by the end of the week. Penner Medical Products Penner was a family owned business which was a medical supplies...
Review the Robatelli's Pizzeria Case Study. Develop another internal controls system, but this time, in the...
Review the Robatelli's Pizzeria Case Study. Develop another internal controls system, but this time, in the purchases and fixed assets business areas. Prepare a 12- to 16-slide presentation describing the purchases and fixed assets business areas. Be sure to incorporate speaker notes as well as appropriate visuals, graphics, fonts, etc. Include any associated risk in these areas. Describe specific internal controls that include authorization of transactions, segregation of duties, adequate records and documentation, security of assets, and independent checks and...