Daily expected profit level of a design K1 = 550*0.8*{(90/100)*(2.75-1.4) + (10/100)*(-1.4)} + 550*0.2*{(70/100)*(2.75-1.4) + (30/100)*(-1.4)} = $530.75
Daily expected profit level of a design K2 = 550*0.85*{(90/100)*(2.75-1.4) + (10/100)*(-1.4)} + 550*0.15*{(75/100)*(2.75-1.4) + (25/100)*(-1.4)} = $557.22
Daily expected profit level of a design K3 = 550*0.9*{(95/100)*(2.75-1.4) + (5/100)*(-1.4)} + 550*0.1*{(80/100)*(2.75-1.4) + (20/100)*(-1.4)} = $644.19
Total expected profit for K1 = 530.75*300 – 100000 = $59,255
Total expected profit for K2 = 557.22*300 – 140000 = $27166
Total expected profit for K3 = 644.19*300 – 180000 = $13256.25
So, design K1 gives maximum expected profit.