Question

Company A supplies 40% of the computers sold and is late 5% of the time. Company...

Company A supplies 40% of the computers sold and is late 5% of the time. Company B supplies 30% of the computers sold and is late 3% of the time. Company C supplies another 30% and is late 2.5% of the time. A computer arrives late - what is the probability that it came from Company A?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Factories A, B and C produce computers. Factory A produces 2 times as many computers as...
Factories A, B and C produce computers. Factory A produces 2 times as many computers as factory C, and factory B produces 5 times as many computers as factory C. The probability that a computer produced by factory A is defective is 0.016, the probability that a computer produced by factory B is defective is 0.031, and the probability that a computer produced by factory C is defective is 0.052. A computer is selected at random and it is found...
The computer lab has some new computers. From experience it had been determined that when computers...
The computer lab has some new computers. From experience it had been determined that when computers breakdown , the Dell’s do so 40% of the time; IBM computers break down 30% of the time and HP computers break down 30% of the time. What is the probability that in a random sample of 20 computers that break down,7 are from Dell,5 are from IBM and 8 from HP?
Consider a manufacturing cell in company ABC that repairs defective computers. Computers arrive to the cell...
Consider a manufacturing cell in company ABC that repairs defective computers. Computers arrive to the cell and wait in a single queue to be processed on a first-come-first-serve basis by one repair operator who can only work on one computer at a time. Assume that the simulation begins at time 0 with a computer (Computer #1) already being processed (scheduled to be complete in 30 minutes) and another computer (computer #2) waiting in the queue (with a process time of...
A computer company manufactures two types of computers. Each type of computer will require assembly time,...
A computer company manufactures two types of computers. Each type of computer will require assembly time, inspection time, and storage space. The amounts of each of these resources that can be devoted to the production of the computers is limited. The manager wants to determine the quantity of each computer to produce to maximize the profit generated by sales of these computers. In order to develop a suitable model of the problem, the manager has met with design and manufacturing...
The number of computers sold in a local computer store in Albany follows a Poisson distribution...
The number of computers sold in a local computer store in Albany follows a Poisson distribution with a mean of 2 per week (Side note, this store will probably bankrupt soon, and this note has nothing to do with the question). The sales in the store are monitored in periods of 4 weeks. Find the probability that in the next 4 weeks, only 3 computers will be sold. Find the probability that in the next 4 weeks, more than 5...
At a 24-hour computer repair facility broken-down computers arrive at an average rate of 3 per...
At a 24-hour computer repair facility broken-down computers arrive at an average rate of 3 per day, Poisson distributed. What is the probability that on a given day no computers arrive for repair? What is the probability that on a given day at least 3 computers arrive for repair? What is the distribution of the time between arrivals of computers to this facility and what is the average time between arrivals? On one particular day no computer has arrived for...
5.9. (Computer project) Twenty computers are connected in a network. One computer be- comes infected with...
5.9. (Computer project) Twenty computers are connected in a network. One computer be- comes infected with a virus. Every day, this virus spreads from any infected computer to any uninfected computer with probability 0.1. Also, every day, a computer technician takes 5 infected computers at random (or all infected computers, if their number is less than 5) and removes the virus from them. Estimate: (a) the expected time it takes to remove the virus from the whole network; (b) the...
For a certain type of computers, the length of time between charges of the battery is...
For a certain type of computers, the length of time between charges of the battery is normally distributed with a mean of 42 hours and a standard deviation of 18 hours. a. If 20 computers are randomly selected, what is the probability that the mean charging time of their batteries is more than 45 hours? b. If 38 computers are randomly selected, what is the probability that the mean charging time of their batteries is between 37 and 40 hours?...
A meal delivery company in Waco, claims that the amount of time his drivers are late...
A meal delivery company in Waco, claims that the amount of time his drivers are late is uniformly distributed on the interval from 0 to 15 minutes. What is the probability that a randomly selected delivery is more than 10.5 minutes late? Give your answer to 3 decimal places.
Delivery time can be classified as early, on time or, late. Delivery distance can be classified...
Delivery time can be classified as early, on time or, late. Delivery distance can be classified as within 5 miles, between 5 and 10 miles, and over 10 miles. From the previous records, 15% of deliveries arrive early, and 55% arrive on time. 70% of orders are within 5 miles, and 25% of orders are between 5 and 10 miles. The probability for arriving on time if delivery distance is over 10 miles is 0. The probability of a shipment...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT