A geophysical firm is acquiring seismic data to investigate the depth to the bedrock beneath a landfill.
When seismic data were acquired, the depth to bedrock could be estimated for 60% of the data sets. However, drilling results revealed that 30% of the time, the depth to bedrock estimated from seismic data was incorrect.
What is the probability that performing a seismic survey in a different portion of the landfill will provide the correct depth to bedrock?
We are given the following probabilities:
We need to find the probability:
Hence the required probability that performing a seismic survey in a different portion of the landfill will provide the correct depth to bedrock = 18%
Please do upvote if you are satisfied! Let me know in the comments if anything is not clear. I will reply ASAP!