Question

A machine operator at a pencil-manufacturing facility gathered 10 different random samples of 100 pencils. The...

A machine operator at a pencil-manufacturing facility gathered 10 different random samples of 100 pencils. The operator’s inspection was to determine whether the pencils were in compliance or out of compliance with specifications. The results of this inspection are shown below. Use these data to construct a p chart.

Sample Size Number out of Compliance
1 100 2
2 100 7
3 100 4
4 100 3
5 100 3
6 100 5
7 100 2
8 100 0
9 100 1
10 100 6

create a p chart

Homework Answers

Answer #1

From the Chart we conclude that the process of pencils is under Compliance within specification Limit

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The results of inspection of DNA samples taken over the past 10 days are given below....
The results of inspection of DNA samples taken over the past 10 days are given below. Sample size is 100. Day 1 2 3 4 5 6 7 8 9 10 # of defectives 7 6 6 9 5 0 0 8 6 1 (a) Determine the fraction defective of the p chart. Please give the formula and at least one step of calculation for full credit. (6 points) (b) Determine the of the p chart. Please give the formula...
Supplementary Problem 18.15 A bottled-water company has been randomly inspecting bottles of water to determine whether...
Supplementary Problem 18.15 A bottled-water company has been randomly inspecting bottles of water to determine whether they are acceptable for delivery and sale. The inspectors are looking at water quality, bottle condition, and seal tightness. A series of 10 random samples of 50 bottles each is taken. Some bottles are rejected. Use the following information on the number of bottles from each batch that were rejected as being out of compliance to construct a p chart. Sample N Number out...
Tire Pressures. Six samples, each consisting of 10 automobile tires, were selected, and the pressure (in...
Tire Pressures. Six samples, each consisting of 10 automobile tires, were selected, and the pressure (in kilopascals, kPa) in each tire was measured. The tires were filled by a machine on an automobile assembly line. The means and ranges for the samples are shown here. Construct and analyze an ?X chart and an R chart for the data. Sample 1 2 3 4 5 6 Mean 223.2 242 238 223 229 242 R 26.2 14.5 25.5 15.2 20.7 21.4
Edit question The results of inspection of samples of a product taken over the past 5...
Edit question The results of inspection of samples of a product taken over the past 5 days are given below. Sample size for each day has been 100: Day        1             2             3             4             5 Defectives           2             6             14           3             7 Determine the UCL for this chart Determine the LCL for this chart Is this process in control?
A company collects 20 samples with 100 eggs in each sample. They want to construct a...
A company collects 20 samples with 100 eggs in each sample. They want to construct a P chart to track the proportion of broken eggs in each sample. The table below shows the number of defective eggs per sample. Sample Eggs 1 3 2 5 3 3 4 4 5 2 6 4 7 2 8 6 9 4 10 9 11 2 12 6 13 5 14 1 15 5 16 0 17 2 18 6 19 2 20...
The table lists the number of defective 60-watt lightbulbs found in samples of 100 bulbs selected...
The table lists the number of defective 60-watt lightbulbs found in samples of 100 bulbs selected over 25 days from a manufacturing process. Assume that during this time the manufacturing process was not producing an excessively large fraction of defectives. Day 1 2 3 4 5 6 7 8 9 10 Defectives 5 2 6 8 4 4 5 6 7 2 Day 11 12 13 14 15 16 17 18 19 20 Defectives 2 5 3 4 1 3...
The table lists the number of defective 60-watt lightbulbs found in samples of 100 bulbs selected...
The table lists the number of defective 60-watt lightbulbs found in samples of 100 bulbs selected over 25 days from a manufacturing process. Assume that during this time the manufacturing process was not producing an excessively large fraction of defectives. Day 1 2 3 4 5 6 7 8 9 10 Defectives 5 3 5 8 4 5 4 6 6 2 Day 11 12 13 14 15 16 17 18 19 20 Defectives 3 5 4 4 1 2...
Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart...
Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart for control. The samples and the number of defectives in each are shown in the following table: SAMPLE n NUMBER OF DEFECTIVE ITEMS IN THE SAMPLE 1 15 2 2 15 2 3 15 2 4 15 0 5 15 2 6 15 1 7 15 3 8 15 2 9 15 1 10 15 3 a. Determine the p−p− , Sp, UCL and...
Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart...
Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart for control. The samples and the number of defectives in each are shown in the following table: SAMPLE n NUMBER OF DEFECTIVE ITEMS IN THE SAMPLE 1 15 1 2 15 1 3 15 3 4 15 1 5 15 0 6 15 0 7 15 2 8 15 1 9 15 2 10 15 1 a. Determine the p−p− , Sp, UCL and...
Problem 10-25 Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is...
Problem 10-25 Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up to produce a large run of resistors of 1,000 ohms each. Use Exhibit 10.13.      To set up the machine and to create a control chart to be used throughout the run, 15 samples were taken with four resistors in each sample. The complete list of samples and their measured values are as follows: Use three-sigma control limits. SAMPLE NUMBER READINGS (IN OHMS)...