Question

Sun Systems makes two types of retractable awnings - Premium and Deluxe. Each Premium unit produced...

Sun Systems makes two types of retractable awnings - Premium and Deluxe. Each Premium unit produced requires 50 minutes processing on Machine 1 and 30 minutes processing on Machine 2. Each Deluxe unit produced requires 25 minutes processing on Machine 1 and 30 minutes processing on Machine 2. At the start of the current week there are 25 Premium units and 40 Deluxe units in stock. Machine 1 has 20 hours of processing time available during the current week and Machine 2 has 15 hours of processing time available during the current week. The demand for Premium units in the current week is forecast to be 40 units and for Deluxe units is forecast to be 50 units.

How many Premium units and how many Deluxe units should be made during the current week to maximize the sum of the Premium units and Deluxe units in stock at the end of the current week?

If multiple solutions (optima) exist, you must find them ALL to receive full credit.

Hint: Will the method of solution you choose be able to find multiple optima?

Homework Answers

Answer #1

answer:

  • Let the quantity of premium units made amid the week be 'P' and number of luxurious units made be 'D'.
  • Whole of shutting stock = aggregate of opening stock + P + D - entirety of week after week request = (25+40)+P+D-(40+50) = P+D-25
  • This is the target capacity and this must be expanded.

Constraints:

(I) 50P+25D<=1200. This limitation is identified with machine 1. The aggregate of time required by Premium and fancy ought not surpass the accessible time. Accessible time = 20 hours or 20*60 = 1200 minutes.

(ii) 30P+30d<=900. This limitation is identified with machine 2. The aggregate of time required by Premium and fancy ought not surpass the accessible time. Accessible time = 15 hours or 15*60 = 900 minutes.

(iii) P,D>=0. This is non negative limitation i.e. generation can't be a negative number.

  • Understanding in exceed expectations, utilizing the solver work, following arrangement is gotten:

  • so these is the total explanation of above
Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires 3 hours to assemble and 1 2 hour to paint, and the economy model requires 2 hours to assemble and 1 hour to paint. The maximum number of assembly hours available is 24 per day, and the maximum number of painting hours available is 8 per day. If the profit on the deluxe model is $90 per unit and the profit on the economy...
Pappy's Toys makes two models of a metal toy—Standard and DeLuxe. Both models are produced on...
Pappy's Toys makes two models of a metal toy—Standard and DeLuxe. Both models are produced on a single machine. The price and costs of the two models appear as follows.     Standard   DeLuxe Price per unit   $   65      $   85      Variable cost per unit   $   30      $   34      Machine hours per unit      0.5         1.5      The one machine that used to produce both models has a capacity of 95,000 machine-hours per quarter. Fixed...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires...
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires 3 hours to assemble and 1/2 hour to paint, and the economy model requires 2 hours to assemble and 1 hour to paint. The maximum number of assembly hours available is 24 per day, and the maximum number of painting hours available is 8 per day. If the profit on the deluxe model is $94 per unit and the profit on the economy model...
SuperToys has 4,000 production hours available for January for three of its products: Regular boat, Deluxe...
SuperToys has 4,000 production hours available for January for three of its products: Regular boat, Deluxe boat, Super-deluxe boat. The rate of production (i.e. how many units can be produced per hour), the market demand, selling price and cost data for the three products are provided in the following table: Regular boat Deluxe boat Super-Deluxe boat Demand for January (in units) 100,000 78,000 30,000 Unit selling price $40 $70 $90 Unit variable cost $20 $45 $40 Unit Contribution Margin $20...
Deluxe Tourist Annual sales in units 1,000 9,000 Direct materials per unit $30 $30 Direct labor-hours...
Deluxe Tourist Annual sales in units 1,000 9,000 Direct materials per unit $30 $30 Direct labor-hours per unit 1 1 Direct labor rate $17 per DLH Estimated Overhead Expected Activity Activities and Activity Measures Cost Deluxe Tourist Total Labor related (direct labor-hours) $35,000 1,000 9,000 10,000 Machine steups (setups) 120,000 40 60 100 Production Order (orders) 70,000 35 15 50 General Factory (machine-hours) 150,000 10,000 10,000 20,000 $375,000 1.) What is the ABC unit product cost for the Deluxe model?...
A manufacturing plant produces two types of widgets: standard model; deluxe model. Each unit requires the...
A manufacturing plant produces two types of widgets: standard model; deluxe model. Each unit requires the use of direct labor and labor time per unit differs between models. Manufacturing is done in production runs and each run has a set-up. For the month, the plant recorded the following: Standard Deluxe 2,000 1,000 Units produced $20,000 $30,000 Direct labor costs 4 12 Number of production runs Consider the salaries of production supervisors ($90,000). How much of this cost should be assigned...
Two types of gears are produced: A and B. Gear A has a unit contribution margin...
Two types of gears are produced: A and B. Gear A has a unit contribution margin of $200, and Gear B has a unit contribution margin of $400. Gear A uses 2 hours of grinding time, and Gear B uses 5 hours of grinding time. There are 200 hours of grinding time available per week. This is the only internal constraint. a. Determine the optimal mix. b. What is the total contribution margin? c. Suppose that there is an additional...
The Hamilton Company manufactures two products: X and Y.  Contribution margin per unit is determined as follows:...
The Hamilton Company manufactures two products: X and Y.  Contribution margin per unit is determined as follows:                                                        Product X       Product Y Revenue........................................... $130................. $80 Variable Costs................................... .$70................. $38 Contribution margin............................ $60................. $42 Total demand for X is 16,000 units and for Y is 8,000 units. Machine hours are a scarce resource. 42,000 machine hours are available during the year. Product X requires 6 machine hours per unit, while Product Y requires 3 machine hours per unit. How many units of X and...
1. A firm produces four products: Each unit of product 1 requires two hours of assembly,...
1. A firm produces four products: Each unit of product 1 requires two hours of assembly, one hour of painting and $50 of inventory, Each unit of product 2 requires one hour of assembly, three hours of painting and $75 of inventory, Each unit of product 3 requires 2.5 hours of assembly, 2.5 hours of painting and $20 of inventory, Each unit of product 4 requires 5 hours of assembly no painting and $100 of inventory. The firm has 140...
Harriet is trying to determine how many units of two types of lawn mowers to produce...
Harriet is trying to determine how many units of two types of lawn mowers to produce each day. One of these is the Standard model, while the other is the Deluxe model. The profit per unit on the Standard model is $60, while the profit per unit on the Deluxe model is $40. The Standard model requires 20 minutes of assembly time, while the Deluxe model requires 35 minutes of assembly time. The Standard model requires 10 minutes of inspection...