Question

An industrial engineer is investigating the effect of four assembly methods (1, 2, 3, 4) on...

  1. An industrial engineer is investigating the effect of four assembly methods (1, 2, 3, 4) on the assembly time for a color television component. Four operators are selected for the study. To account for the operator source of variability, the engineer uses the Randomized Complete Block Design shown below. Analyze the data from this experiment ( = 0.05) draw appropriate conclusions.

    Assembly

    Operator

    Method

    A

    B

    C

    D

    1

    5

    10

    7

    8

    2

    7

    10

    12

    8

    3

    12

    18

    14

    14

    4

    10

    11

    11

    9

    1. Do the assembly methods have the same mean time? Use a=0.05.
      1. State the hypotheses,
      2. What is the test statistic?
      3. What is the p-value?
      4. What is the decision?
      5. Make conclusions
    2. Could the experiment be run completely random?
    3. Suppose that assembly method 3 is currently used. Use Dunnett’s procedure to compare the means. Which assembly method would you recommend?
    4. Analyze the residual for the model in part a) and comment on the adequacy of the model. What would you recommend?
      1. State the hypotheses,
      2. What are the p-values?
      3. What are the decisions?
      4. Make conclusions.
    5. Based in your answer in part (d), conduct the appropriate transformation for the assembly time and make conclusions.
    6. Use Fisher’s LSD method to compare all pair of assembly time transformation means. What conclusions can you draw
    7. Conduct a nonparametric analysis for this experiment and draw conclusions.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
An industrial engineer is investigating the effect of four assembly methods (A, B, C, and D)...
An industrial engineer is investigating the effect of four assembly methods (A, B, C, and D) on the assembly time for a color television component. Four operators are selected for the study. Furthermore, the engineer knows that each assembly method produces such fatigue that the time required for the last assembly may be greater than the time required for the first, regardless of the method. To account for this source of variability, the engineer uses the design below. explain the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 39 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 13 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained: SST = 13,490; SSTR =...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 42 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 14 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained: SST = 13,960; SSTR =...