An instructor who taught two sections of engineering statistics last term, the first with 25 students and the second with 40, decided to assign a term project. After all projects had been turned in, the instructor randomly ordered them before grading. Consider the first 15 graded projects.
(a) What is the probability that exactly 10 of these are from
the second section? (Round your answer to four decimal
places.)
(b) What is the probability that at least 10 of these are from the
second section? (Round your answer to four decimal places.)
(c) What is the probability that at least 10 of these are from the
same section? (Round your answer to four decimal places.)
(d) What are the mean value and standard deviation of the number
among these 15 that are from the second section? (Round your mean
to the nearest whole number and your standard deviation to three
decimal places.)
mean | projects |
standard deviation | projects |
(e) What are the mean value and standard deviation of the number of
projects not among these first 15 that are from the second section?
(Round your mean to the nearest whole number and your standard
deviation to three decimal places.)
mean | projects |
standard deviation | projects |
a) P(X=10)= C(40,10)*C (25,5)/C(65,15) = 0.2172
b) P(at least 10) = P(X≥10) = 0.4406
c) P(at least 10 from same section) = P(at least 10 from section
1) + P(atleast 10 from section 2) = 0.0126+0.4406 =
0.4532
d)
mean = E(X) = n(k/N) = 9.230 ≈
9
variance = VAR(X) = nk/N(1 - k/N)((N-n)/(N-1))
2.7737
std dev = √variance = 1.665
e)
mean = 40-9 = 31
std dev= 1.665
Get Answers For Free
Most questions answered within 1 hours.