Number of Absences Grade
2 3.8
3 2.8
6 2.4
6 2.1
6 2
7 1.9
7 1.6
Step 1 of 5 :
Calculate the sum of squared errors (SSE). Use the values b0=4.2309b0=4.2309 and b1=−0.3518b1=−0.3518 for the calculations. Round your answer to three decimal places.
Step 2 of 5: Calculate the estimated variance of error
Step 3 of 5: : Calculate the estimate variance of slope
step 4 of 5: construct the 80% confidence interval for the slope
lower endpoint =
upper endpoint=
Step 1 of 5 : Calculate the sum of squared errors (SSE)=0.354
Step 2 of 5: Calculate the estimated variance of error =0.071
Step 3 of 5: : Calculate the estimate variance of slope =0.003
step 4 of 5: construct the 80% confidence interval for the slope :
lower endpoint = -0.433
upper endpoint= -0.271