Question

Problem 12-18 (Algorithmic) A building contractor is preparing a bid on a new construction project. Two...

Problem 12-18 (Algorithmic)

A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from the other contractors can be described by the following probability distributions:

Contractor Probability Distribution of Bid
A Uniform probability distribution between $600,000 and $800,000
B Normal probability distribution with a mean bid of $700,000 and a standard deviation of $50,000

If required, round your answers to three decimal places.

  1. If the building contractor submits a bid of $750,000, what is the probability that the building contractor will obtain the bid? Use an Excel worksheet to simulate 1,000 trials of the contract bidding process.

    The probability of winning the bid of $750,000 = ??

  2. The building contractor is also considering bids of 775,000 and $785,000. If the building contractor would like to bid such that the probability of winning the bid is about 0.5, what bid would you recommend? Repeat the simulation process with bids of $775,000 and $785,000 to justify your recommendation.

    The probability of winning the bid of $775,000 = ??
    The probability of winning the bid of $785,000 = ??

    The recommendation would be to choose the bid of: $750000, $775000, $785000 ???

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Problem 12-18 (Algorithmic) A building contractor is preparing a bid on a new construction project. Two...
Problem 12-18 (Algorithmic) A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from the other contractors can be described by the following probability distributions: Contractor Probability Distribution of Bid A Uniform probability distribution between $530,000 and $730,000 B Normal probability distribution with a mean bid of $630,000 and a standard deviation of $43,000 If required, round your answers to three...
A building contractor is preparing a bid on a new construction project. Two other contractors will...
A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from the other contractors can be described by the following probability distributions: Contractor Probability Distribution of Bid A Uniform probability distribution between $570,000 and $770,000 B Normal probability distribution with a mean bid of $670,000 and a standard deviation of $47,000 If required, round your answers to three decimal places. If...
Problem 12-14 (Algorithmic) The management of Madeira Manufacturing Company is considering the introduction of a new...
Problem 12-14 (Algorithmic) The management of Madeira Manufacturing Company is considering the introduction of a new product. The fixed cost to begin the production of the product is $30,000. The variable cost for the product is uniformly distributed between $20 and $25 per unit. The product will sell for $55 per unit. Demand for the product is best described by a normal probability distribution with a mean of 1,200 units and a standard deviation of 200 units. Develop an Excel...
Reliable Construction Company Reliable Construction Company is deciding how much they will bid for a contract...
Reliable Construction Company Reliable Construction Company is deciding how much they will bid for a contract to build a new plant for a major manufacturer. Based on the specifications of the new plant, Reliable has estimated what the company’s total cost would be if it were to undertake the project. Reliable estimates that the project would cost $4.55 million (M) and are thinking about bidding $5.4 M in the proposal. Reliable also estimates that the cost of preparing a proposal...
Reliable Construction Company Reliable Construction Company is deciding how much they will bid for a contract...
Reliable Construction Company Reliable Construction Company is deciding how much they will bid for a contract to build a new plant for a major manufacturer. Based on the specifications of the new plant, Reliable has estimated what the company’s total cost would be if it were to undertake the project. Reliable estimates that the project would cost $4.55 million (M) and are thinking about bidding $5.4 M in the proposal. Reliable also estimates that the cost of preparing a proposal...
Problem 12-11 (Algorithmic) In preparing for the upcoming holiday season, Fresh Toy Company (FTC) designed a...
Problem 12-11 (Algorithmic) In preparing for the upcoming holiday season, Fresh Toy Company (FTC) designed a new doll called The Dougie that teaches children how to dance. The fixed cost to produce the doll is $150,000. The variable cost, which includes material, labor, and shipping costs, is $39 per doll. During the holiday selling season, FTC will sell the dolls for $49 each. If FTC overproduces the dolls, the excess dolls will be sold in January through a distributor who...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT