Question

For the data set shown​ below, complete parts ​(a) through ​(d) below. x 20 30 40...

For the data set shown​ below, complete parts ​(a) through ​(d) below.

x

20

30

40

50

60

y

100

93

89

85

70

(a) Find the estimates of β0 and β1.

β0 ≈b0 = ____ ​(Round to two decimal places as​ needed.)

β1 ≈b1 = ____ (Round to two decimal places as​ needed.)

​(b)  Compute the standard​ error, the point estimate for σ.

se= ______ ( Rounding to four decimal places)

​(c)  Assuming the residuals are normally​ distributed, determine sb1 .

Sb1= _____ ( Rounding to four decimal places)

(d) ​Assuming the residuals are normally​ distributed, test H0 :β1=0 versus H1 :β1≠0 at the α=0.05 level of significance. Use the​ P-value approach.

The​ P-value for this test is _____ (rounding to three decimal places.)

Homework Answers

Answer #1

a)

bo=114.600

b1=-0.680

b)se =3.5963

c)sb1=0.1137

d)

p value= 0.009

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
For the data set shown​ below, complete parts​ (a) through​ (d) below. x 3 4 5...
For the data set shown​ below, complete parts​ (a) through​ (d) below. x 3 4 5 7 8 y 4 7 8 12 13 (a) Find the estimates of β0 and β1. β0 ≈b0 = ____ ​(Round to three decimal places as​ needed.) β1 ≈b1 = ____ (Round to three decimal places as​ needed.) ​(b)  Compute the standard​ error, the point estimate for σ. se= ______ ​(c)  Assuming the residuals are normally​ distributed, determine sb1 . Sb1= _____ (d) ​Assuming...
For the data set shown below, complete parts (a) through (d) below. X 20 30 40...
For the data set shown below, complete parts (a) through (d) below. X 20 30 40 50 60 Y 98 93 91 85 68 ​ (a) Use technology to find the estimates of beta 0 and beta 1. beta 0 ~ b 0=_____​(Round to two decimal places as​ needed.) beta 1 ~ b 1=_____(Round to two decimal places as​ needed.) (b) Use technology to compute the standard error, the point estimate for o' (o with a little tag on the...
For the data set shown​ below x   y 20   98 30   95 40   91 50   83...
For the data set shown​ below x   y 20   98 30   95 40   91 50   83 60   70 ​(a) Use technology to find the estimates of β0 and β1. β0≈b0=114.60 ​(Round to two decimal places as​ needed.) β1≈b1=−0.68 ​(Round to two decimal places as​ needed.) ​ (b) Use technology to compute the standard​ error, the point estimate for σ. Se=3.7771 ​(Round to four decimal places as​ needed.) ​(c) Assuming the residuals are normally​ distributed, use technology to determine sb1. sb1=__?__...
For the data set shown below, complete parts (a) through (d). X Y 20 102 30...
For the data set shown below, complete parts (a) through (d). X Y 20 102 30 97 40 93 50 83 60 72 (a) Find the estimates of Bo and B1. Bo=bo= _____ (Round to three decimal places as needed.) B1=b1= ______(Round to four decimal places as needed.) (b) Compute the standard error the point estimate for se= ____ (c) Assuming the residuals are normally distributed, determine Sb1=____ (Round to four decimal places as needed.) (d) Assuming the residuals are...
For the data set shown​ below x   y 20   98 30   95 40   91 50   83...
For the data set shown​ below x   y 20   98 30   95 40   91 50   83 60   70 ​(a) Use technology to find the estimates of β0 and β1. β0 ≈b0=114.60 ​(Round to two decimal places as​ needed.) β1≈b1=−0.68 ​(Round to two decimal places as​ needed.) ​(b) Use technology to compute the standard​ error, the point estimate for σ. se=3.7771 ​(Round to four decimal places as​ needed.) ​(c) Assuming the residuals are normally​ distributed, use technology to determine sb1. sb1equals=__?__...
For the data set shown​ below, complete parts ​(a) through ​(d) below. x y 20 98...
For the data set shown​ below, complete parts ​(a) through ​(d) below. x y 20 98 30 95 40 89 50 85 60 72 (a) Use technology to find the estimates of Β0 and Β1. Β0 ≈ b0 = 112.6 ​(Round to two decimal places as​ needed.) Β1 ≈ b1 = -0.62 (Round to two decimal places as​ needed.) (b) Use technology to compute the standard​ error, the point estimate for σ. Se = __?__ ​(Round to four decimal places...
For the data set shown​ below x   y 20   98 30   95 40   91 50   83...
For the data set shown​ below x   y 20   98 30   95 40   91 50   83 60   70 ​(a) Use technology to find the estimates of β0 and β1. β0≈b0equals=114.60 ​(Round to two decimal places as​ needed.) β1≈b1=−0.68 ​(Round to two decimal places as​ needed.) ​ (b) Use technology to compute the standard​ error, the point estimate for σ. Se=3.7771 ​(Round to four decimal places as​ needed.) ​(c) Assuming the residuals are normally​ distributed, use technology to determine sb1. sb1=__?__...
For the data set shown​ below, complete parts ​(a) through ​(d) below. x 20 30 40...
For the data set shown​ below, complete parts ​(a) through ​(d) below. x 20 30 40 50 60 y 102 95 91 83 70 ​ (a) Use technology to find the estimates of beta 0 and beta 1. beta 0 almost equals b0= ​ (Round to two decimal places as​ needed.) beta1 almost equals b1= (Round to two decimal places as​ needed.) (b) Use the technology to compute the standard error, the point estimate for o. Sc= (Round to four...
For the data set shown​ below, complete parts ​(a) through ​(d) below. x 20 30 40...
For the data set shown​ below, complete parts ​(a) through ​(d) below. x 20 30 40 50 60 y 98 95 91 83 68 ​(a) Use technology to find the estimates of β0 and β1. ANSWER: β0≈b=115.80 ​(Round to two decimal places as​ needed.) β1≈b1=−0.720 ​(Round to two decimal places as​ needed.) (b) Use technology to compute the standard​ error, the point estimate for σ. se=_______???? ​(Round to four decimal places as​ needed.) I need help answering this please. Please...
As concrete​ cures, it gains strength. The following data represent the​ 7-day and​ 28-day strength in...
As concrete​ cures, it gains strength. The following data represent the​ 7-day and​ 28-day strength in pounds per square inch​ (psi) of a certain type of concrete. 7-Day_Strength_(psi)_-_x   28-Day_Strength_(psi)_-_y 2300   4070 3380   5020 2620   4190 3390   5220 3330   4850 (a) Treating the​ 7-day strength as the explanatory​ variable, x, use technology to determine the estimates of β0 and β1. β0≈b0=1753.9 ​ (Round to one decimal place as​ needed.) β1≈b1=0.9707 ​ (Round to four decimal places as​ needed.) Se=150.6 ​(Round to...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT