Question

Case Problem 2 - PRODUCTION STRATEGY Better Fitness, Inc. (BFI), manufactures exercise equipment at its plant...

Case Problem 2 - PRODUCTION STRATEGY Better Fitness, Inc. (BFI), manufactures exercise equipment at its plant in Freeport, Long Island. It recently designed two universal weight machines for the home exercise market. Both machines use BFI-patented technology that provides the user with an extremely wide range of motion capability for each type of exercise performed. Until now, such capabilities have been available only on expensive weight machines used primarily by physical therapist. At a recent trade show, demonstration of the machines resulted in significant dealer interest. In fact, the number of orders that BFI received at the trade show far exceeded its manufacturing capabilities for the number of orders that BFI received at the trade show far exceeded its manufacturing capabilities for the current production period. As a result, management decide to begin production of the two machines. The two machines, which BFI has named the BodyPlus 100 and the BodyPlus 200, require different amounts of resources to produce. The BodyPlus 100 consists of a frame unit, a press station, and a pec-dec station. Each frame produced uses 4 hours of machining and welding time and 2 hours of painting and finishing time. Each press station requires 2 hours of machining and welding time and 1 hour of painting and finishing time, and each pec-dec station uses 2 hours of machining and welding time and 2 hours of painting and finishing time. In addition, 2 hours are spent assembling, testing, and packaging each BodyPlus 100. The raw material costs are $450 for each frame, $300 for each press station and $250 for each pec-dec station; packaging costs are estimated to be $50 per unit. The BodyPlus 200 consists of a frame unit, a press station, a pec-dec station, and a leg-press station. Each frame produced uses 5 hours of machining and welding time and 4 hours of painting and finishing time. Each press station requires 3 hours machining and welding time and 2 hours of painting and finishing time, and each leg-press station requires 2 hours of machining and welding time and 2 hours of painting and finishing time. In addition, 2 hours are spent assembling, testing, and packaging each BodyPlus 200. The raw material costs are $650 for each frame, $400 for each press station, $250 for each pec-dec station, and $200 for each leg-press station; packaging costs are estimated to be $75 per unit. For the next production period, management estimates that 600 hours of machining And welding time, 450 hours of painting and finishing time, and 140 hours of assembly, testing, and packaging time will be available. Current labor costs are $20 per hour for machining and welding time, $15 per hour for painting and finishing time, and $12 per hour for assembly, testing and packaging time. The market in which the two machines must compete suggests a retail price of $2400 for the BodyPlus 100 and $3500 for the BodyPlus 200, although some flexibility may be available to BFI because of the unique capabilities of the new machines. Authorized BFI dealers can purchase machines for 70% of the suggested retail prices. BFI’s president believes that the unique capabilities of the BodyPlus 200 can help position BFI as one of the leaders in high-end exercise equipment. Consequently, he has stated that the number of units of the BodyPlus 200 produced must be least 25% of the total production.

Please explain in words how to get the constraints and how to solve for the total profit.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Atlas Enterprises Inc. manufactures elliptical exercise machines and treadmills. The products are produced in its Fabrication...
Atlas Enterprises Inc. manufactures elliptical exercise machines and treadmills. The products are produced in its Fabrication and Assembly production departments. In addition to production activities, several other activities are required to produce the two products. These activities and their associated activity rates are as follows: Activity Activity Rate Fabrication $27 per machine hour Assembly $13 per direct labor hour Setup $49 per setup Inspecting $26 per inspection Production scheduling $14 per production order Purchasing $11 per purchase order The activity-base...
Sheridan Innovations, Inc. produces exercise and fitness gear. Two of its newer products require a finishing...
Sheridan Innovations, Inc. produces exercise and fitness gear. Two of its newer products require a finishing process that can only be completed on machines that were recently purchased for this purpose. The machines have a maximum capacity of 6,000 machine hours, and no other products that the company makes use these machines. Sarah Jacob, the company’s operations manager, is preparing the production schedule for the coming month and can’t seem to find enough machine time to produce enough units to...
Atlas Enterprises Inc. manufactures elliptical exercise machines and treadmills. The products are produced in its Fabrication...
Atlas Enterprises Inc. manufactures elliptical exercise machines and treadmills. The products are produced in its Fabrication and Assembly production departments. In addition to production activities, several other activities are required to produce the two products. These activities and their associated activity rates are as follows: Activity Activity Rate Fabrication $30 per machine hour Assembly $15 per direct labor hour Setup $54 per setup Inspecting $32 per inspection Production scheduling $16 per production order Purchasing $13 per purchase order The activity-base...
Atlas Enterprises Inc. manufactures elliptical exercise machines and treadmills. The products are produced in its Fabrication...
Atlas Enterprises Inc. manufactures elliptical exercise machines and treadmills. The products are produced in its Fabrication and Assembly production departments. In addition to production activities, several other activities are required to produce the two products. These activities and their associated activity rates are as follows: Activity Activity Rate Fabrication $31 per machine hour Assembly $17 per direct labor hour Setup $46 per setup Inspecting $32 per inspection Production scheduling $18 per production order Purchasing $15 per purchase order The activity-base...
Problem 4-1A Combat Fire, Inc. manufactures steel cylinders and nozzles for two models of fire extinguishers:...
Problem 4-1A Combat Fire, Inc. manufactures steel cylinders and nozzles for two models of fire extinguishers: (1) a home fire extinguisher and (2) a commercial fire extinguisher. The home model is a high-volume (54,000 units), half-gallon cylinder that holds 2 1/2 pounds of multi-purpose dry chemical at 480 PSI. The commercial model is a low-volume (10,200 units), two-gallon cylinder that holds 10 pounds of multi-purpose dry chemical at 390 PSI. Both products require 1.5 hours of direct labor for completion....
Reducir, Inc., produces two different types of hydraulic cylinders. Reducir produces a major subassembly for the...
Reducir, Inc., produces two different types of hydraulic cylinders. Reducir produces a major subassembly for the cylinders in the Cutting and Welding Department. Other parts and the subassembly are then assembled in the Assembly Department. The activities, expected costs, and drivers associated with these two manufacturing processes are given below. Process Activity Cost Activity Driver Expected Quantity Cutting and Welding Welding $ 776,000    Welding hours 4,000 Machining 450,000    Machine hours 10,000 Inspecting 448,250    No. of inspections 1,000 Materials handling 300,000...
Product Costs using Activity Rates Hercules Inc. manufactures elliptical exercise machines and treadmills. The products are...
Product Costs using Activity Rates Hercules Inc. manufactures elliptical exercise machines and treadmills. The products are produced in its Fabrication and Assembly production departments. In addition to production activities, several other activities are required to produce the two products. These activities and their associated activity rates are as follows: Activity Activity Rate Fabrication $24 per machine hour Assembly $17 per direct labor hour Setup $51 per setup Inspecting $23 per inspection Production scheduling $18 per production order Purchasing $15 per...
Product Costs using Activity Rates Hercules Inc. manufactures elliptical exercise machines and treadmills. The products are...
Product Costs using Activity Rates Hercules Inc. manufactures elliptical exercise machines and treadmills. The products are produced in its Fabrication and Assembly production departments. In addition to production activities, several other activities are required to produce the two products. These activities and their associated activity rates are as follows: Activity Activity Rate Fabrication $26 per machine hour Assembly $12 per direct labor hour Setup $55 per setup Inspecting $30 per inspection Production scheduling $13 per production order Purchasing $10 per...
Question 1. AUMexx manufactures tables in its production plant. The plant takes custom orders from clients....
Question 1. AUMexx manufactures tables in its production plant. The plant takes custom orders from clients. Each order is processed in three stations. First, information about the order is passed to Station A where an employee spends 1.5 hours at Station A to create the legs for the custom table. The information about the order and table legs are then transferred to Station B where an employee takes 2.5 hours to create a table top. The order information, legs, and...
Atlas Enterprises Inc. manufactures elliptical exercise machines and treadmills. The products are produced in its Fabrication...
Atlas Enterprises Inc. manufactures elliptical exercise machines and treadmills. The products are produced in its Fabrication and Assembly production departments. In addition to production activities, several other activities are required to produce the two products. These activities and their associated activity rates are as follows: Activity Activity Rate Fabrication $28 per machine hour Assembly $20 per direct labor hour Setup $75 per setup Inspecting $30 per inspection Production scheduling $12 per production order Purchasing $8 per purchase order The activity-base...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT