Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in centimeters) are being examined. A random sample of 21 roller bearings from the old manufacturing process showed the sample variance of diameters to be s2 = 0.237. Another random sample of 28 roller bearings from the new manufacturing process showed the sample variance of their diameters to be s2 = 0.128. Use a 5% level of significance to test the claim that there is a difference (either way) in the population variances between the old and new manufacturing processes.

Classify the problem as being a Chi-square test of independence or homogeneity, Chi-square goodness-of-fit, Chi-square for testing or estimating σ2 or σ, F test for two variances, One-way ANOVA, or Two-way ANOVA, then perform the following.

Chi-square test of homogeneity

Chi-square test of independence     

Chi-square for testing or estimating σ2 or σ

One-way ANOVA

F test for two variances

Chi-square goodness-of-fit

Two-way ANOVA

(i) Give the value of the level of significance.
0.05

State the null and alternate hypotheses.

H0: σ12 = σ22; H1: σ12 > σ22

H0: σ12 = σ22; H1: σ12σ22     

H0: σ12 = σ22; H1: σ12 < σ22

H0: σ12 < σ22; H1: σ12 = σ22


(ii) Find the sample test statistic. (Round your answer to two decimal places.)
_____

(iii) Find the P-value of the sample test statistic.

P-value > 0.200

0.100 < P-value < 0.200     

0.050 < P-value < 0.100

0.020 < P-value < 0.050

0.002 < P-value < 0.020

P-value < 0.002


(iv) Conclude the test.

Since the P-value is greater than or equal to the level of significance α = 0.05, we fail to reject the null hypothesis.

Since the P-value is less than the level of significance α = 0.05, we reject the null hypothesis.     

Since the P-value is less than the level of significance α = 0.05, we fail to reject the null hypothesis.

Since the P-value is greater than or equal to the level of significance α = 0.05, we reject the null hypothesis.


(v) Interpret the conclusion in the context of the application.

At the 5% level of significance, there is insufficient evidence to show that the variance for the new manufacturing process is different.

At the 5% level of significance, there is sufficient evidence to show that the variance for the new manufacturing process is not different.     

At the 5% level of significance, there is insufficient evidence to show that the variance for the new manufacturing process is not different.

At the 5% level of significance, there is sufficient evidence to show that the variance for the new manufacturing process is different.

Homework Answers

Answer #1

F test for two variances

..................

Null and alternative hypothesis:  
Hₒ : σ₁² = σ₂²  
H₁ : σ₁² ≠ σ₂²  
Test statistic:  
F = s₁² / s₂² = 0.237 / 21 =    1.85
Degree of freedom:  
df₁ = n₁-1 =    20
df₂ = n₂-1 =    27

P-value :  
P-value = 2*F.DIST.RT(1.8516, 20, 27) =    0.1356


THANKS

revert back for doubt

please upvote

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in centimeters) are being examined. A random sample of 21 roller bearings from the old manufacturing process showed the sample variance of diameters to be s2 = 0.224. Another random sample of 26 roller bearings from the new manufacturing process showed the sample variance of their diameters to be s2 = 0.121. Use a 5% level of significance to test the claim that there is...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in centimeters) are being examined. A random sample of 21 roller bearings from the old manufacturing process showed the sample variance of diameters to be s2 = 0.217. Another random sample of 26 roller bearings from the new manufacturing process showed the sample variance of their diameters to be s2 = 0.132. Use a 5% level of significance to test the claim that there is...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in centimeters) are being examined. A random sample of 21 roller bearings from the old manufacturing process showed the sample variance of diameters to be s2 = 0.238. Another random sample of 29 roller bearings from the new manufacturing process showed the sample variance of their diameters to be s2 = 0.112. Use a 5% level of significance to test the claim that there is...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in centimeters) are being examined. A random sample of 26 roller bearings from the old manufacturing process showed the sample variance of diameters to be s2 = 0.231. Another random sample of 28 roller bearings from the new manufacturing process showed the sample variance of their diameters to be s2 = 0.146. Use a 5% level of significance to test the claim that there is...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in centimeters) are being examined. A random sample of 21 roller bearings from the old manufacturing process showed the sample variance of diameters to be s2 = 0.238. Another random sample of 27 roller bearings from the new manufacturing process showed the sample variance of their diameters to be s2 = 0.131. Use a 5% level of significance to test the claim that there is...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in centimeters) are being examined. A random sample of 16 roller bearings from the old manufacturing process showed the sample variance of diameters to be s2 = 0.236. Another random sample of 26 roller bearings from the new manufacturing process showed the sample variance of their diameters to be s2 = 0.12. Use a 5% level of significance to test the claim that there is...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in centimeters) are being examined. A random sample of 26 roller bearings from the old manufacturing process showed the sample variance of diameters to be s2 = 0.25. Another random sample of 29 roller bearings from the new manufacturing process showed the sample variance of their diameters to be s2 = 0.14. Use a 5% level of significance to test the claim that there is...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in...
Two processes for manufacturing large roller bearings are under study. In both cases, the diameters (in centimeters) are being examined. A random sample of 26 roller bearings from the old manufacturing process showed the sample variance of diameters to be s2 = 0.221. Another random sample of 26 roller bearings from the new manufacturing process showed the sample variance of their diameters to be s2 = 0.121. Use a 5% level of significance to test the claim that there is...
A new thermostat has been engineered for the frozen food cases in large supermarkets. Both the...
A new thermostat has been engineered for the frozen food cases in large supermarkets. Both the old and new thermostats hold temperatures at an average of 25°F. However, it is hoped that the new thermostat might be more dependable in the sense that it will hold temperatures closer to 25°F. One frozen food case was equipped with the new thermostat, and a random sample of 26 temperature readings gave a sample variance of 5.1. Another similar frozen food case was...
A new thermostat has been engineered for the frozen food cases in large supermarkets. Both the...
A new thermostat has been engineered for the frozen food cases in large supermarkets. Both the old and new thermostats hold temperatures at an average of 25°F. However, it is hoped that the new thermostat might be more dependable in the sense that it will hold temperatures closer to 25°F. One frozen food case was equipped with the new thermostat, and a random sample of 21 temperature readings gave a sample variance of 4.6. Another similar frozen food case was...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT