Question

***Please use Excel*** Suppose that a single-sampling plan with n = 170 and c = 3...

***Please use Excel***

Suppose that a single-sampling plan with n = 170 and c = 3 is being used for receiving inspection where the supplier ships the product in lots of size N = 4,000

(a) Draw the OC curve for this plan.

(b) Draw the AOQ curve and find the AOQL.

(c) Draw the ATI curve for this plan.

(d) Find the level of lot quality that will be rejected 90% of the time.

(e) Suppose that incoming lots are 2% nonconforming. What is the probability of rejecting these lots?

***Use Excel***

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Suppose that a supplier ships components in lots of size 5000. A single-sampling plan with n...
Suppose that a supplier ships components in lots of size 5000. A single-sampling plan with n = 50 and c = 2 is being used for receiving inspection. Rejected lots are screened, and all defective items are reworked and returned to the lot. (a) Draw the OC curve for this plan. (b) Find the level of lot quality that will be rejected 90% of the time. (c) Management has objected to the use of the above sampling procedure and wants...
you have a sampling plan of n = 135, c = 4. An incoming lot of...
you have a sampling plan of n = 135, c = 4. An incoming lot of electronics has a Quality level of 6.75%. What is the probability that you will reject this lot? Question 1 options: 0.9136 0.9297 0.9431 0.9542
You have a sampling plan of n = 125, c = 6. The next incoming lot...
You have a sampling plan of n = 125, c = 6. The next incoming lot has a Quality level of 4.25% What is the probability of accepting this lot? Question 5 options: 0.9590 0.8364 0.7176 0.9141
Acceptance Sampling: For the sampling plan defined by N=1500, n=150, c=2 3. Develop the Operational Characteristics...
Acceptance Sampling: For the sampling plan defined by N=1500, n=150, c=2 3. Develop the Operational Characteristics Curve. With this plan, what is the probability of acceptance for a batch that contains 2% non-conforming material? 4. Develop the Average Total Inspection curve. With this plan, what is the average total inspection for batches that contain 2% non-conforming material?
For a double-sampling plan with n1= 75 c1= 2 n2= 110 c2= 6 a. Draw the...
For a double-sampling plan with n1= 75 c1= 2 n2= 110 c2= 6 a. Draw the OC curves (Probability of acceptance on first sample, Probability of acceptance on combined samples, Probability of rejection on first sample) (You must use a scatter plot) b. If the incoming lots have fraction nonconforming p= 0,07 " b.1. What is the probability of acceptance on the first sample? " b.2. What is the probability of final acceptance? b.3. Calculate the probability of rejection on...
You have a sampling plan of n = 75, c = 3 What level of incoming...
You have a sampling plan of n = 75, c = 3 What level of incoming Quality will still be accepted one third of the time?
For the sampling plan defined by N=1500, n=150, c=2 3. Develop the Operational Characteristics Curve. With...
For the sampling plan defined by N=1500, n=150, c=2 3. Develop the Operational Characteristics Curve. With this plan, what is the probability of acceptance for a batch that contains 2% non-conforming material? 4. Develop the Average Total Inspection curve. With this plan, what is the average total inspection for batches that contain 2% non-conforming material?
You have a sampling plan of n = 75, c = 3 What level of incoming...
You have a sampling plan of n = 75, c = 3 What level of incoming Quality will still be accepted one third of the time? Question 4 options: 6.00% 6.75% 6.20% 7.25%
Many companies use a quality control technique called acceptance sampling to monitor incoming shipments of parts,...
Many companies use a quality control technique called acceptance sampling to monitor incoming shipments of parts, raw materials, and so on. In the electronics industry, component parts are commonly shipped from suppliers in large lots. Inspection of a sample of 40 components can be viewed as the 40 trials of a binomial experiment. The outcome for each component tested (trial) will be that the component is classified as good or defective. Reynolds Electronics accepts a lot from a particular supplier...
Many companies use a quality control technique called acceptance sampling to monitor incoming shipments of parts,...
Many companies use a quality control technique called acceptance sampling to monitor incoming shipments of parts, raw materials, and so on. In the electronics industry, component parts are commonly shipped from suppliers in large lots. Inspection of a sample of 40 components can be viewed as the 40 trials of a binomial experiment. The outcome for each component tested (trial) will be that the component is classified as good or defective. Reynolds Electronics accepts a lot from a particular supplier...