Question

if the mean no. of flawed items produced by a factory manufacture line per 2 hour...

if the mean no. of flawed items produced by a factory manufacture line per 2 hour period is two. Assume that the number of flawed items produced in a one-hour period is observed 9 times, thus giving 9 independent observations Y1 , Y2 ,...Y9.. Find the probability that Y > 3 during at least one of the 9 one-hour intervals.

Homework Answers

Answer #1

Given the mean number of flawed items produced by a factory manufacture line per 2 hour period is 2.

So we can say the average number of flawed items produced by a factory manufacture line per 1 hour period is 1.

We can say the number of flawed items produced by a factory manufacture line per 1 hour period is Poisson distributed with . Thew probability

The probability

The R command for the above probability is

> 1-ppois(3,1)
[1] 0.01898816

The probabilty that at least one of Y1, Y2,...,Y9 is greater than 3 is

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The number of automobiles entering a tunnel per 2-minute period follows a Poisson distribution. The mean...
The number of automobiles entering a tunnel per 2-minute period follows a Poisson distribution. The mean number of automobiles entering a tunnel per 2-minute period is four. (A) Find the probability that the number of automobiles entering the tunnel during a 2- minute period exceeds one. (B) Assume that the tunnel is observed during four 2-minute intervals, thus giving 4 independent observations, X1, X2, X3, X4, on a Poisson random variable. Find the probability that the number of automobiles entering...
Suppose that defective items on a production line occur according to a Poisson distribution, at an...
Suppose that defective items on a production line occur according to a Poisson distribution, at an average rate of 3 defective items per hour. Let X count the number of defective items produced over a one-hour period. What is the probability that more than 4 defective items will be produced during the one-hour period?
Suppose that the distribution of the number of items x produced by an assembly line during...
Suppose that the distribution of the number of items x produced by an assembly line during an 8-hr shift can be approximated by a normal distribution with mean value 130 and standard deviation 10. (Round your answers to four decimal places.) (a) What is the probability that the number of items produced is at most 110? P(x ? 110) =   (b) What is the probability that at least 105 items are produced? P(x ? 105) =   (c) What is the...
Suppose that it is known that the number of items produced in a factory during a...
Suppose that it is known that the number of items produced in a factory during a week is a random variable with mean 50. If the variance of a weekâs production is known to equal 26, then what can be said about the probability that this weekâs production will be between 40 and 60?
A factory hiring people to work on an assembly line gives job applicants a test of...
A factory hiring people to work on an assembly line gives job applicants a test of manual agility. This test counts how many strangely shaped pegs the applicant can fit into matching holes in a one-minute period. The table below summarizes data collected for 90 applicants - 45 men and 45 women: Male Female n 45 45 Mean 20.05 17.34 Std Dev 2.708 3.65 Find separate 90% confidence intervals for the average number of pegs males and females can correctly...
Each sweat shop worker at a computer factory can put together 4.7 computers per hour on...
Each sweat shop worker at a computer factory can put together 4.7 computers per hour on average with a standard deviation of 0.9 computers. 6 workers are randomly selected to work the next shift at the factory. Round all answers to 4 decimal places where possible and assume a normal distribution. What is the distribution of X? X ~ N(____________,_____________) What is the distribution of ¯x? ¯x ~ N(______________,_____________) What is the distribution of ∑x ? ∑x ~ N(_____________,_____________) If...
Each sweat shop worker at a computer factory can put together 4 computers per hour on...
Each sweat shop worker at a computer factory can put together 4 computers per hour on average with a standard deviation of 0.7 computers. 7 workers are randomly selected to work the next shift at the factory. Round all answers to 4 decimal places where possible and assume a normal distribution. What is the distribution of XX? XX ~ N(,) What is the distribution of ¯xx¯? ¯xx¯ ~ N(,) What is the distribution of ∑x∑x? ∑x∑x ~ N(,) If one...
Each sweat shop worker at a computer factory can put together 4.7 computers per hour on...
Each sweat shop worker at a computer factory can put together 4.7 computers per hour on average with a standard deviation of 0.7 computers. 48 workers are randomly selected to work the next shift at the factory. Round all answers to 4 decimal places where possible and assume a normal distribution. What is the distribution of XX? XX ~ N(,) What is the distribution of ¯xx¯? ¯xx¯ ~ N(,) What is the distribution of ∑x∑x? ∑x∑x ~ N(,) If one...
Each sweat shop worker at a computer factory can put together 4.9 computers per hour on...
Each sweat shop worker at a computer factory can put together 4.9 computers per hour on average with a standard deviation of 0.8 computers. 43 workers are randomly selected to work the next shift at the factory. Round all answers to 4 decimal places where possible and assume a normal distribution. What is the distribution of X ? X ~ N( 4.9 Correct, 0.8 Correct) What is the distribution of ¯ x ? ¯ x ~ N( 4.9 Correct, .1220...
LeBron Factory Number of Workers Number of Machines Output (chairs produced per hour) Marginal Product of...
LeBron Factory Number of Workers Number of Machines Output (chairs produced per hour) Marginal Product of Labor Cost of Workers Cost of Machines Total Cost ?1 ?2 ?5 ?2 ?2 ?10 ?3 ?2 ?20 ?4 ?2 ?35 ?5 ?2 ?55 ?6 ?2 ?70 ?7 ?2 ?80 Refer to Table above. First, complete the missing information in the Table above.   1.Each worker at the LeBron Chair Factory costs $12 per hour. The cost of each machine is $20 per day regardless...