Question 2.

JJ Painting Company is a well known construction contractor in the Boston area. The company was established in 2001, and they specialize in exterior painting. Management believes that the paint coating thickness is directly correlated with paint drying time. They have conducted a study to uncover the relationship between coating thickness and drying time.

Below are the results of their study.

Coating Thickness (mm)
18.18
8.07
20.65
2.96
22.45
22.01
9.4
15.22
4.8
2.86
13.3
20.71
3.37
5.14
22.1
9.15
13.18
15.37
16.44
16.48
25.05
7.77
21.2
6.36
3.59
20.39
18.68
25.86
8.26
13.73
20.13
24.82
9.03
12.48
18.61
2.73
21.63
12.38
24.14
24.31
6.18
8.9
11.35
2.12
23
21.09
24.33
13.82
5.65
7.5
8.47
11.82
1.97
20.01
22.9
13.06
20.94
11.43
14.85
22.13
14.3
24.38
14.03
13.51
10.94
19.58
15.71
16.61
17.11
4.55
15.36
25.93
18.18
3.63
3.77
15.82
1.79
17.28
13.88
24.32
21.28
3.79
17.3
13.11
16.48
8.16
11.98
16.67
23.82
19.64
15.14
20.67
1.73
Drying Time (s)
165.36
50.26
243.27
109.24
325.2
251.41
157.8
230.46
70.47
102.73
217.76
248.95
132.2
23.98
250.54
157.94
183.48
177.54
213.79
171.85
257.97
97.29
262.48
102.71
101.51
259.47
217.13
386.07
56.37
200.39
277.89
233.14
117.34
164.91
245.63
73.63
288.67
130.85
383.72
274.85
56.36
164.6
222.11
124
344.38
306.98
325.71
164.7
96.34
125.71
114.13
141.31
91.78
211.93
215.83
210.06
291.83
181.75
160.37
323.47
202.83
222.66
169.96
154.28
159.66
264.38
126.74
171.31
183.9
44.65
157.67
345.6
246.75
65.85
175.58
243.08
16.57
224.06
183.99
235.78
218.82
156.49
213.65
162.88
142.51
154.52
197.59
185.4
348.92
242.69
191.03
166.75
62.33

Regress the coating thickness against the paint drying time.

Based on this analysis, how much more time in seconds, will the paint take to dry, if coating thickness is increased by 1 mm. ?(Write your answer as a number with at least 2 decimal places)

Homework Answers

Answer #1

using excel data analysis tool pak for regression,we get following output:-

Simple Linear Regression Analysis
Regression Statistics
Multiple R 0.8629
R Square 0.7446
Adjusted R Square 0.7418
Standard Error 41.4258
Observations 93
ANOVA
df SS MS F Significance F
Regression 1 455361.8005 455361.8005 265.3475 0.0000
Residual 91 156164.7494 1716.0961
Total 92 611526.5499
Coefficients Standard Error t Stat P-value Lower 95% Upper 95% Lower 95% Upper 95%
Intercept 45.3408 9.7809 4.6356 0.0000 25.9122 64.7693 25.9122 64.76930
Coating Thickness (mm) 9.9717 0.6122 16.2895 0.0000 8.7557 11.1876 8.7557 11.18765

-------------------------------

so, regression equation is

drying time(s)=9.9717*coating thickness(mm)+45.3408

--------------------------------------

Based on this analysis, how much more time in seconds, will the paint take to dry, if coating thickness is increased by 1 mm.

answer:9.97 seconds

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT