Question

please post solutions using R Consider a batch manufacturing process in which a machine processes jobs...

please post solutions using R

Consider a batch manufacturing process in which a machine processes jobs in batches of three units. The process starts only when there are three or more jobs in the buffer in front of the machine. Otherwise, the machine stays idle until the batch is completed. Assume that job interarrival times are uniformly distributed between 2 and 8 hours, and batch service times are uniformly distributed between 5 and 15 hours.

Assuming the system is initially empty, simulate the system manually for three batch service completions and calculate the following statistics:

• Average number of jobs in the buffer (excluding the batch being served)

• Probability distribution of number of jobs in the buffer (excluding the batch being served)

• Machine utilization

• Average job waiting time (time in buffer)

• Average job system time (total time in the system, including processing time)

• System throughput (number of departing jobs per unit time)

Approach: After each arrival, schedule the next interarrival time, and when each batch goes into service, schedule its service completion time. To obtain these quantities, use your calculator to generate a sequence of random numbers (these are equally likely between 0 and 1, and statistically independent of each other). Then transform these numbers as follows:

a. To generate the next random interarrival time, A, generate the next random number U from your calculator, and set A = 2 + 6 U .

b. To generate the next random batch service time, B , generate the next random number U from your calculator, and set B = 5 + 10 U . If you cannot use random numbers from your calculator, use instead deterministic interarrival times, A = 5 (the average of 2 and 8), and deterministic service times B = 10 (the average of 5 and 15).

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Consider a batch manufacturing process in which a machine processes jobs in batches of three units....
Consider a batch manufacturing process in which a machine processes jobs in batches of three units. The process starts only when there are three or more jobs in the buffer in front of the machine. Otherwise, the machine stays idle until the batch is completed. Assume that job interarrival times are uniformly distributed between 2 and 8 hours, and batch service times are uniformly distributed between 5 and 15 hours. Assuming the system is initially empty, simulate the system manually...
please post solutions using R a manufacturing facility has a repair shop with two repairmen who...
please post solutions using R a manufacturing facility has a repair shop with two repairmen who repair failed machines on a first-fail-first-serve basis. They work together on the machine if there is one machine down (the repair still takes the same amount of time), and otherwise, each works on a separate machine. Thus, if there are more than two machines down, new failures simply wait for their turn to be repaired. Assume that machine failures arrive in a combined failure...
The following jobs are waiting to be processed at Rick? Solano's machine center.? Solano's machine center...
The following jobs are waiting to be processed at Rick? Solano's machine center.? Solano's machine center has a relatively long backlog and sets a fresh schedule every 2? weeks, which does not disturb earlier schedules. Below are the jobs to be scheduled? today, which is day 241 ?(day 241 is a work? day). Job names refer to names of clients and contract numbers. Compute all times based on initiating work on day 241. (Job) (Date Job Received) (Due Date Duration...
The following jobs are waiting to be processed at Rick? Solano's machine center.? Solano's machine center...
The following jobs are waiting to be processed at Rick? Solano's machine center.? Solano's machine center has a relatively long backlog and sets a fresh schedule every 2? weeks, which does not disturb earlier schedules. Below are the jobs to be scheduled? today, which is day 241 ?(day 241 is a work? day). Job names refer to names of clients and contract numbers. Compute all times based on initiating work on day 241. (Job) (Date Job Received) (Due Date Duration...
The following jobs are waiting to be processed at Rick? Solano's machine center.? Solano's machine center...
The following jobs are waiting to be processed at Rick? Solano's machine center.? Solano's machine center has a relatively long backlog and sets a fresh schedule every 2? weeks, which does not disturb earlier schedules. Below are the jobs to be scheduled? today, which is day 241 ?(day 241 is a work? day). Job names refer to names of clients and contract numbers. Compute all times based on initiating work on day 241. (Job) (Date Job Received) (Due Date Duration...
A manufacturing facility has a repair shop with two repairmen who repair failed machines on a...
A manufacturing facility has a repair shop with two repairmen who repair failed machines on a first-fail-first-serve basis. They work together on the machine if there is one machine down (the repair still takes the same amount of time), and otherwise, each works on a separate machine. Thus, if there are more than two machines down, new failures simply wait for their turn to be repaired. Assume that machine failures arrive in a combined failure stream, so that we do...
Please answer the following Case analysis questions 1-How is New Balance performing compared to its primary...
Please answer the following Case analysis questions 1-How is New Balance performing compared to its primary rivals? How will the acquisition of Reebok by Adidas impact the structure of the athletic shoe industry? Is this likely to be favorable or unfavorable for New Balance? 2- What issues does New Balance management need to address? 3-What recommendations would you make to New Balance Management? What does New Balance need to do to continue to be successful? Should management continue to invest...
Please read the article and answear about questions. Determining the Value of the Business After you...
Please read the article and answear about questions. Determining the Value of the Business After you have completed a thorough and exacting investigation, you need to analyze all the infor- mation you have gathered. This is the time to consult with your business, financial, and legal advis- ers to arrive at an estimate of the value of the business. Outside advisers are impartial and are more likely to see the bad things about the business than are you. You should...
What tools could AA leaders have used to increase their awareness of internal and external issues?...
What tools could AA leaders have used to increase their awareness of internal and external issues? ???ALASKA AIRLINES: NAVIGATING CHANGE In the autumn of 2007, Alaska Airlines executives adjourned at the end of a long and stressful day in the midst of a multi-day strategic planning session. Most headed outside to relax, unwind and enjoy a bonfire on the shore of Semiahmoo Spit, outside the meeting venue in Blaine, a seaport town in northwest Washington state. Meanwhile, several members of...
Using the model proposed by Lafley and Charan, analyze how Apigee was able to drive innovation....
Using the model proposed by Lafley and Charan, analyze how Apigee was able to drive innovation. case:    W17400 APIGEE: PEOPLE MANAGEMENT PRACTICES AND THE CHALLENGE OF GROWTH Ranjeet Nambudiri, S. Ramnarayan, and Catherine Xavier wrote this case solely to provide material for class discussion. The authors do not intend to illustrate either effective or ineffective handling of a managerial situation. The authors may have disguised certain names and other identifying information to protect confidentiality. This publication may not be...