Question

Suppose that the specification limits for a production process are LSL = 0.02 and USL =...

Suppose that the specification limits for a production process are LSL = 0.02 and USL = 0.10, with the nominal specification being 0.06. a)_____________ What is the sigma level if the process standard deviation is 0.01. b)_____________ If the process is centered, what is the DPMO?

can you show me how to do it in excel?

what variables do I use? thank you

Homework Answers

Answer #1

thank you

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Given a process with design nominal = 4 Mils +/- 4 (or USL = 8 and...
Given a process with design nominal = 4 Mils +/- 4 (or USL = 8 and LSL = 0) and Cpk = 1.33. A company decided to implement a system of calling the engineer to adjust the process every time a sample (n = 4) average (xbar) was equal to nominal + ½ specification limits (process average = 6 or 2) What is the total probably of the engineer being called to adjust the process: _____%, or One out of...
Suppose that you have a process that is stable with data for a critical characteristic that...
Suppose that you have a process that is stable with data for a critical characteristic that is known to be normally distributed.  For this example, assume that the mean is known to be 42.18 and the standard deviation is 0.21.  The specifications for this process are LSL = 41 and USL = 43.  Solve the following: What is the z-score of the LSL? What percentage of the product will measure below the LSL for this characteristic? What is the z-score of the USL?...
Suppose that you have a process that is stable with data for a critical characteristic that...
Suppose that you have a process that is stable with data for a critical characteristic that is known to be normally distributed.  For this example, assume that the mean is known to be 42.18 and the standard deviation is 0.21.  The specifications for this process are LSL = 41 and USL = 43.  Solve the following: What is the True Cp? What is the True CPU? What is the True CPL? What is the True Cpk? What is the z-score of the LSL?...
Process capability analysis is often defined as: The ability to make the process reliable and maintainable...
Process capability analysis is often defined as: The ability to make the process reliable and maintainable The inherent variability of items produced by the process The variability allowed by the specification limits The determination that the process can meet the product specifications as intended 2 points    QUESTION 97 What is the appropriate hypothesis test when you have statements such as "greater than," "exceeds," and "less than"? A two-sided test is appropriate since the direction of the difference does not...
BridgeRock is a major manufacturer of tires in the U.S.. The company had five manufacturing facilities...
BridgeRock is a major manufacturer of tires in the U.S.. The company had five manufacturing facilities where tires were made and another 20 facilities for various components and materials used in tires. Each manufacturing facility produced 10,000 tires every hour. Quality had always been emphasized at BridgeRock, but lately quality was a bigger issue because of recent fatal accidents involving tires made by other manufacturers due to tread separation. All tire manufacturers were under pressure to ensure problems did not...
Suppose that you have been assigned to the production of bottled 20 oz. soda.The process has...
Suppose that you have been assigned to the production of bottled 20 oz. soda.The process has upper and lower spec limits of 20.5 and 19.5 oz, respectively, with a mean of 19.8 oz and standard deviation of 0.1 oz. Your manager has requested the process produce no more than 3.4 defects per 1 million bottles produced. a)Calculate Cp and Cpk and then determine if the process is capable according to the manager's standard?
The Gidget Company makes widgets. If the production process is working​ properly, it turns out that...
The Gidget Company makes widgets. If the production process is working​ properly, it turns out that the widgets are normally distributed with a mean length of at least 3.4 feet. Larger widgets can be used or altered but shorter widgets must be scrapped. You select a sample of 25 ​widgets, and the mean length is 3.35 feet and the sample standard deviation is 0.24 foot. Do you need to adjust the production​ equipment? Complete parts​ (a) through​ (d). If you...
Airlines sometimes overbook flights. Suppose that for a plane with 50 seats, 55 passengers have tickets....
Airlines sometimes overbook flights. Suppose that for a plane with 50 seats, 55 passengers have tickets. Define the random variable Y as the number of ticketed passengers who actually show up for the flight. The probability mass function of Yappears in the accompanying table. y 45 46 47 48 49 50 51 52 53 54 55 p(y)       0.04     0.10     0.11     0.14     0.25     0.19     0.06     0.05     0.03     0.02     0.01   (a) What is the probability that the flight will accommodate all ticketed...
1) What are some indicators that there are assignable causes for variation in a process? I.Process...
1) What are some indicators that there are assignable causes for variation in a process? I.Process capability. II. Data patters outside of the control limits. III. Data patters within the control limits. IV. Points randomly falling above and below the control chart center line. a. II and III b. II, III, IV c. I, II, IV d. I, II, III, IV 2) The best quantitative tool to determine the cause for variation in a process is: a. ANOVA b. Correllation...
Note: You need to show your work. If you choose to use Excel for your calculations,...
Note: You need to show your work. If you choose to use Excel for your calculations, be sure to upload your well-documented Excel and to make note in this file of what Excel functions you used and when you used them, and how you arrived at your answers. If you choose to do the work by hand, Microsoft Word has an equation editor. Go to “Insert” and “Equation” on newer versions of Word. On older versions, go to “Insert” and...