Question

The work done on a system is time dependent, where W(t) = (2.00 J/s)t + (0.500...

The work done on a system is time dependent, where W(t) = (2.00 J/s)t + (0.500 J/s3)t3. (a) What is the instantaneous power at t = 0.665s and (b) t = 1.16s? Now let us assume that we know the instantaneous power to be P(t) = (3.50 J/s2)t + (1.50 J/s3)t2. Assuming that there is no work done on the system at t = 0, what is work done at (c) t = 0.865s and (d) t = 1.25s?

Homework Answers

Answer #1

Instantaneous power is given as dW/dt. As given that

(a) at t= 0.665s

(b) at t= 1.16s

Now Given that

(c) at t=0.865 s

(d) at t= 1.25 s

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
8 through 10 done please!! 3.13.6 Question 110 pts A 319 kg motorcycle is parked in...
8 through 10 done please!! 3.13.6 Question 110 pts A 319 kg motorcycle is parked in a parking garage. If the car has 35,494 J of potential energy, how many meters above ground is the car? Report your answer to 1 decimal place. Please do not include units or the answer will be marked incorrect. Flag this Question Question 210 pts A box sitting on the top of a hill has 252 J of potential energy. If the hill is...
THIS IS THE GENERAL EQUILIBRIUM PROBLEM THAT I PROMISED. YOU FIRST SOLVE FOR THE INITIAL EQUILIBRIUM...
THIS IS THE GENERAL EQUILIBRIUM PROBLEM THAT I PROMISED. YOU FIRST SOLVE FOR THE INITIAL EQUILIBRIUM AS POINT A. WE CONSIDER TWO DIFFERENT AND SEPARATE SHOCKS (I CALL THEM SCENARIOS). THE FIRST SHOCK IS TO THE IS CURVE, THE SECOND SHOCK IS A ‘LM’ SHOCK. AGAIN, WE CONSIDER THESE SHOCKS SEPARATELY SO THAT AFTER YOU COMPLETE SCENARIO 1 (THE IS SHOCK), WE GO BACK TO THE ORIGINAL CONDITIONS AND CONSIDER THE SECOND SCENARIO WHICH IS THE ‘LM’ SHOCK. Consider the...
Review the Robatelli's Pizzeria Case Study. Develop another internal controls system, but this time, in the...
Review the Robatelli's Pizzeria Case Study. Develop another internal controls system, but this time, in the purchases and fixed assets business areas. Prepare a 12- to 16-slide presentation describing the purchases and fixed assets business areas. Be sure to incorporate speaker notes as well as appropriate visuals, graphics, fonts, etc. Include any associated risk in these areas. Describe specific internal controls that include authorization of transactions, segregation of duties, adequate records and documentation, security of assets, and independent checks and...
Please answer the following Case analysis questions 1-How is New Balance performing compared to its primary...
Please answer the following Case analysis questions 1-How is New Balance performing compared to its primary rivals? How will the acquisition of Reebok by Adidas impact the structure of the athletic shoe industry? Is this likely to be favorable or unfavorable for New Balance? 2- What issues does New Balance management need to address? 3-What recommendations would you make to New Balance Management? What does New Balance need to do to continue to be successful? Should management continue to invest...
Please read the article and answear about questions. Determining the Value of the Business After you...
Please read the article and answear about questions. Determining the Value of the Business After you have completed a thorough and exacting investigation, you need to analyze all the infor- mation you have gathered. This is the time to consult with your business, financial, and legal advis- ers to arrive at an estimate of the value of the business. Outside advisers are impartial and are more likely to see the bad things about the business than are you. You should...