Question

A highway has a traffic flow of 15,000 vehicles per hour emitting an average of 2...

A highway has a traffic flow of 15,000 vehicles per hour emitting an average of 2 g/mile of NOx. If the wind speed is 1.5 m/s, calculate the NOx concentration 100 m downwind from the highway under moderately unstable conditions.

Homework Answers

Answer #1

Though we can use any model to solve this kind of question so basocally we will use the emission factor model.

In the emission factor model, where detailed information is not required. The NOx concentration for 100 m is estimated using the equation as,

EF be the amount of NOx concentration over a distance

A be the activity rate that is the traffic flow

E be amount of pollutant per metre

from above formula, Traffic flow i.e, Activity (A) = 4.16 Vehicles/sec ,

Average emission (E) = 2 g of NOx/mile = 0.01242 gram of NOx/meter of road

Wind velocity = 1.5 m/s

Emission factor by above formula = 0.03446 gram of NOx/ meter of road

For the 100 m downwind from highway, it will be

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
   1. A stack emitting 80 g/s of NOx has an effective stack height of 100...
   1. A stack emitting 80 g/s of NOx has an effective stack height of 100 m. The wind speed is 4 m/s. It is a clear summer day with the sun nearly overhead. The emission is near a human inhabited area. Estimate the ground-level NOx concentration (µg/m3) for the following scenarios:        (a) directly downwind at a distance of 2 km. (b) at the point downwind where the NOx, is a maximum. (hint: use diagram on slide 59). What...
A six-lane multilane highway (three lanes in each direction) has a peak-hour factor of 0.90, 11-ft...
A six-lane multilane highway (three lanes in each direction) has a peak-hour factor of 0.90, 11-ft lanes with a 4-ft right side shoulder, and a two-way left-turn lane in the median. The directional peak-hour traffic flow is 4000 vehicles, and the traffic stream has 5% single-unit trucks and 5% tractor-trailers. What will the level of service of this highway be on a 2.5% upgrade that is 1.5 miles long if the speed limit is 55 mph and there are 15...
A data set of traffic stream characteristics, such as space mean speed (u: miles per hour),...
A data set of traffic stream characteristics, such as space mean speed (u: miles per hour), density (k: vehicles per mile) and traffic flow rate (q: vehicles per hour), was collected for a freeway lane. The data reveals a relationship between flow rate (q) and density (k) as calibrated below: q=66*(k-k^2/160) Where, q = flow rate of the lane (vehicles per hour); k = density of the lane (vehicles per mile). Answer the following questions: (1)Determine the free-flow space mean...
A highway department is studying the relationship between traffic flow and speed. The following model has...
A highway department is studying the relationship between traffic flow and speed. The following model has been hypothesized: y = β0 + β1x + ε y = traffic flow in vehicles per hour x = vehicle speed in miles per hour. The following data were collected during rush hour for six highways leading out of the city. Traffic Flow (y) Vehicle Speed (x) 1,257 35 1,331 40 1,227 30 1,336 45 1,349 50 1,125 25 In working further with this...
Civil Engineering-Traffic and highway Engineering Q.An average two-way traffic per day on an existing 2-lane highway...
Civil Engineering-Traffic and highway Engineering Q.An average two-way traffic per day on an existing 2-lane highway counted in 2013 is 6000 commercial vehicles. Vehicle distribution factor is 0.5. Annual growth rate of commercial vehicles, r=5%, design period, n=20 years. Construction of the road is expected to be complete in the year 2016. What is the design daily traffic (in terms of commercial vehicles)
A highway department is studying the relationship between traffic flow and speed. The following model has...
A highway department is studying the relationship between traffic flow and speed. The following model has been hypothesized. y = B0 + B1x + e y = traffic flow in vehicles per hour x = vehicle speed in miles per hour The following data were collected during rush hour for six highways leading out of the city. Traffic Flow ( ) Vehicle Speed ( ) 1294 40 1332 45 1300 40 1233 30 1334 45 1129 25 a. Develop an...
A statistical program is recommended. A highway department is studying the relationship between traffic flow and...
A statistical program is recommended. A highway department is studying the relationship between traffic flow and speed. The following model has been hypothesized: y = β0 + β1x + ε where y = traffic flow in vehicles per hour x = vehicle speed in miles per hour. The following data were collected during rush hour for six highways leading out of the city. Traffic Flow (y) Vehicle Speed (x) 1,257 35 1,328 40 1,225 30 1,333 45 1,348 50 1,122...
A six-lane divided multilane highway (three lanes in each direction) has a measured free-flow speed of...
A six-lane divided multilane highway (three lanes in each direction) has a measured free-flow speed of 50 mi/h. It is on mountainous terrain with a traffic stream consisting of 7% large trucks and buses and 3% recreational vehicles. The driver population adjustment in 0.92. One direction of the highway currently operates at maximum LOS C conditions and it is known that the highway has PHF=0.90. 1. Determine the hourly volume for these conditions. 2. How many vehicles can be added...
On an afternoon with moderate incoming solar radiation and an average wind speed of 2.5 m/s...
On an afternoon with moderate incoming solar radiation and an average wind speed of 2.5 m/s at a height of 10 m above the ground surface, a power plant emits sulfur dioxide at a rate of 1 kg/s. The effective height of stack is 130 m. The wind speed at the effective stack height is 2.8 m/s. Calculate the concentration (in μg/m3) of sulfur dioxide at ground elevation, directly 3 km downwind from the stack (show hand calculation for this...
A highway construction zone has a posted speed limit of 40 miles per hour. Workers working...
A highway construction zone has a posted speed limit of 40 miles per hour. Workers working at the site claim that the mean speed of the vehicles passing through this constuction zone is at least 50 miles per hour. You think the workers claim is wrong and want to prove it. A random sample of 36 vehicles passing through this zone produced a mean speed of 48 miles per hour. The population standard deviation is known to be 4 miles...