Question

Problem 7-3 A time study was conducted on a job that contains four elements. The observed...

Problem 7-3 A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. OBSERVATIONS (minutes per cycle) Element Performance Rating 1 2 3 4 5 6 1 90% 0.44 0.50 0.43 0.45 0.43 0.46 2 85 1.50 1.56 1.47 1.51 1.49 1.52 3 110 0.84 0.89 0.77 0.83 0.84 0.80 4 100 1.10 1.14 1.08 1.15 1.16 1.26 a. Determine the average cycle time for each element. (Round your answers to 3 decimal places.) Element Average cycle 1 2 3 4 b. Find the normal time for each element. (Round your answers to 3 decimal places.) Element Normal time 1 2 3 4 c. Assuming an allowance factor of 17 percent of job time, compute the standard time for this job. (Round your answers to 3 decimal places.) Element Standard time 1 2 3 4

Homework Answers

Answer #1

Average cycle time = Average of observations in each element

Normal time = (Average element time*Performance rating)/100

Standard time = Normal time*(1+allowances)

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A time study was conducted on a job that contains four elements. The observed times and...
A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. OBSERVATIONS (minutes per cycle) Element Performance Rating 1 2 3 4 5 6 1 85 % 0.40 0.45 0.35 0.35 0.35 0.35 2 80 1.40 1.40 1.35 1.35 1.35 1.40 3 125 0.75 0.75 0.65 0.70 0.75 0.70 4 110 1.00 1.05 1.00 1.05 1.05 1.10 a. Determine the average cycle time for...
3) A study of job satisfaction was conducted for four occupations. Job satisfaction was measured on...
3) A study of job satisfaction was conducted for four occupations. Job satisfaction was measured on a scale of 0 – 100 with higher scores indicating higher job satisfaction. The data obtained is summarized n the following crosstabulation. Satisfaction Score Occupation Under 50 50 - 59 60 - 69 70 - 79 80 – 89 Cabinetmaker 0 2 4 3 1 Lawyer 6 2 1 1 0 Physical Therapist 0 5 2 1 2 Systems Analyst 2 1 4 3...
El toro grande restaurant advertises that customers will have their orders taken with three minutes of...
El toro grande restaurant advertises that customers will have their orders taken with three minutes of being seated. Management wants to monitor average times, as it is such an important guarantee for business. Construct x? - and s-charts for the data given in the worksheet pro07-05 in the ch07data.xlsx file for this chapter. a. compute the sample means and the average standard deviation, calculate the control limits, and plot them on control charts. b. does the process appear to be...
Problem 15-05 (Algorithmic) Consider the following time series data. Week 1 2 3 4 5 6...
Problem 15-05 (Algorithmic) Consider the following time series data. Week 1 2 3 4 5 6 Value 16 13 18 11 15 14 Develop a three-week moving average for this time series. Compute MSE and a forecast for week 7. Round your answers to two decimal places. Week Time Series Value Forecast 1 16 2 13 3 18 4 11 5 15 6 14 MSE: _______ The forecast for week 7: ______ Use  = 0.2 to compute the exponential smoothing values...
Consider the following time series data: Month 1 2 3 4 5 6 7 Value 24...
Consider the following time series data: Month 1 2 3 4 5 6 7 Value 24 13 21 14 20 23 15 (b) Develop a three-month moving average for this time series. Compute MSE and a forecast for month 8. If required, round your answers to two decimal places. Do not round intermediate calculation. MSE: The forecast for month 8: (c) Use α = 0.2 to compute the exponential smoothing values for the time series. Compute MSE and a forecast...
Consider the following time series data: Month 1 2 3 4 5 6 7 Value 23...
Consider the following time series data: Month 1 2 3 4 5 6 7 Value 23 13 21 13 19 21 17 b) Develop a three-month moving average for this time series. Compute MSE and a forecast for month 8. If required, round your answers to two decimal places. Do not round intermediate calculation. MSE: The forecast for month 8: (c) Use α = 0.2 to compute the exponential smoothing values for the time series. Compute MSE and a forecast...
Consider the following time series data: Month 1 2 3 4 5 6 7 Value 24...
Consider the following time series data: Month 1 2 3 4 5 6 7 Value 24 13 20 12 19 23 15 Develop a three-month moving average for this time series. Compute MSE and a forecast for month 8. If required, round your answers to two decimal places. Do not round intermediate calculation. MSE: The forecast for month 8: (c) Use α = 0.2 to compute the exponential smoothing values for the time series. Compute MSE and a forecast for...
Consider the following time series. t 1 2 3 4 5 6 7 yt 131 108...
Consider the following time series. t 1 2 3 4 5 6 7 yt 131 108 104 99 95 90 88 (a) Choose the correct time series plot; what type of pattern exists in the data? (b) Use simple linear regression analysis to find the parameters for the line that minimizes MSE for this time series. If required, round your answers to two decimal places. y-intercept, b0 = Slope, b1 = MSE = (c) What is the forecast for t...
Consider the following time series. t 1 2 3 4 5 yt 7 10 10 14...
Consider the following time series. t 1 2 3 4 5 yt 7 10 10 14 16 (a) Choose the correct time series plot. (i) (ii) (iii) (iv) What type of pattern exists in the data? (b) Use simple linear regression analysis to find the parameters for the line that minimizes MSE for this time series. If required, round your answers to two decimal places. y-intercept, b0 = Slope, b1 = MSE = (c) What is the forecast for t...
Exercise 11-3 Measures of Internal Business Process Performance [LO11-3] Management of Mittel Rhein AG of Köln,...
Exercise 11-3 Measures of Internal Business Process Performance [LO11-3] Management of Mittel Rhein AG of Köln, Germany, would like to reduce the amount of time between when a customer places an order and when the order is shipped. For the first quarter of operations during the current year the following data were reported: Inspection time 0.5 days Wait time (from order to start of production) 15.9 days Process time 2.9 days Move time 0.8 days Queue time 3.9 days Required:...