Question

The profit function for two types of iPod is : Profit = -5 x2^1 + 38X1...

The profit function for two types of iPod is :

Profit = -5 x2^1 + 38X1 - 5X2^2 +44 X2 +520

where x1 and x2 represent number of units of production of basic and advanced iPods, respectively.

Production time required for the basic iPod is 6 hours per unit, and production time required for the advanced iPod is 8 hours per unit. Currently, 50 hours are available. The cost of hours is already factored into the profit function. Formulate an optimization problem that can be used to find the optimal production quantity of basic and advanced iPods. Implement

Homework Answers

Answer #1

I think your equation is not correct But i am solving with this equation and one option eqauation.The process to solve these type of question

1. Convert eqation in form of 1 variable with the help of condition.

2.diffretion eqation and put it equal to 0 And then solve and get value.

-------------------------------------------------------------------------------

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A product is produced using two inputs x1 and x2 costing P1=$10 and P2 = $5...
A product is produced using two inputs x1 and x2 costing P1=$10 and P2 = $5 per unit respectively. The production function is y = 2(x1)1.5 (x2)0.2 where y is the quantity of output, and x1, x2 are the quantities of the two inputs. A)What input quantities (x1, x2) minimize the cost of producing 10,000 units of output? (3 points) B)What is the optimal mix of x1 and x2 if the company has a total budget of $1000 and what...
4. Al’s production function for deer is f(x1, x2) = (2x1 + x2)1/2, where x1 is...
4. Al’s production function for deer is f(x1, x2) = (2x1 + x2)1/2, where x1 is the amount of plastic and x2 is the amount of wood used. If the cost of plastic is $4 per unit and the cost of wood is $4 per unit, then what is the cost of producing 8 deer ?
In Problem 12, Al’s production function for deer is f(x1, x2) = (2x1 + x2)1/2, where...
In Problem 12, Al’s production function for deer is f(x1, x2) = (2x1 + x2)1/2, where x1 is the amount of plastic and x2 is the amount of wood used. If the cost of plastic is $8 per unit and the cost of wood is $1 per unit, then the cost of producing 7 deer is a. $49. b. $28. c. $196. d. $7. e. $119. step by step, please
Consider the problem of a consumer who must choose between two types of goods, good 1...
Consider the problem of a consumer who must choose between two types of goods, good 1 (x1) and good 2 (x2) costing respectively p1 and p2 per unit. He is endowed with an income m and has a quasi-concave utility function u defined by u(x1, x2) = 5 ln x1 + 3 ln x2. 1. Write down the problem of the consumer. 1 mark 2. Determine the optimal choice of good 1 and good 2, x ∗ 1 = x1(p1,...
Bunker Company produces two types of glucose monitors (basic and advanced). Both pass through two producing...
Bunker Company produces two types of glucose monitors (basic and advanced). Both pass through two producing departments: Fabrication and Assembly. Bunker also has an Inspection Department that is responsible for testing monitors to ensure that they perform within prespecified tolerance ranges (a sampling procedure is used). Budgeted data for the three departments are as follows: Inspection Fabrication Assembly Overhead $400,000 $600,000    $170,000   Number of tests — 25,000    75,000   Direct labor hours — 60,000    30,000   In the Fabrication Department, the basic...
A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours...
A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours of wiring and 2 hours of drilling. Each medium fan requires 2 hours of wiring and 1 hour of drilling. There are 480 hours of wiring time available and 280 hours of drilling time available. Each large fan yields a profit of $25. Each medium fan yields a profit of $18. The company wants to manufacture at least 20 large fans. The objective is...
Cost Assignment and JIT Bunker Company produces two types of glucose monitors (basic and advanced). Both...
Cost Assignment and JIT Bunker Company produces two types of glucose monitors (basic and advanced). Both pass through two producing departments: Fabrication and Assembly. Bunker also has an Inspection Department that is responsible for testing monitors to ensure that they perform within prespecified tolerance ranges (a sampling procedure is used). Budgeted data for the three departments are as follows: Inspection Fabrication Assembly Overhead $160,000 $240,000    $68,000   Number of tests — 10,000    30,000   Direct labor hours — 24,000    12,000   In the...
Novacook Ltd makes two types of cooker, one electric and one gas. There are four stages...
Novacook Ltd makes two types of cooker, one electric and one gas. There are four stages in the production of each of these, with the following features: Manufacturing Time Need (hours per unit) Electric Manufacturing Stage Time Needed(hours per unit) Total time available (hours a week Electric Gas Forming 4 2 3457 Machine Shop 10 8 11954 Assembly 6 4 5437 Testing 2 2 2106 Each electric cooker has a variable cost of $200 and a selling price of $300,...
Company A makes 2 models of radios. Model 1 provides a profit of $54 for each...
Company A makes 2 models of radios. Model 1 provides a profit of $54 for each unit, while model 2 provides a profit of $72. Two units materials will be required to make one model 1 Radio, while model 2 needs four units. In addition a model 1 takes 4 hours of the time to produce and model 2 takes 5 hours. If 100 units of raw materials and 140 hours of production times are available, how many of each...
Question: A manufacturing firm has discontinued production of a certain unprofitable product line. Considerable excess production...
Question: A manufacturing firm has discontinued production of a certain unprofitable product line. Considerable excess production capacity was created as a result. Management is considering devoting this excess capacity to one or more of three products: X1, X2, and X3. Machine hours required per unit are as follows:                                                                                           Product Machine Type X1 X2 X3 Milling machine 8 2 3 Lathe 4 3 0 Grinder 2 0 1 The available time in machine hours per week is...