Calculate the number of dealers and Floor people needed for BJ, Craps, and Baccarat for Friday, Day, Swing, and Grave Shifts assuming the following number of Tables are needed
Day Swing Grave
BJ 50 65 30
Craps 12 18 3
Bac 3 4 1
Dealers work 60 minutes followed by a 20 minute break.
To cover the breaks, additional dealers are needed
4 dealers are needed for every 3 tables
Factor in breaks
Dealers Employees needed = (4 dealers required per 3 tables) number of tables * cycle length/minutes worked per cycle
where cycle length is minutes worked per cycle + break time.
minutes worked per cycle is 60 minutes and break time is 20 minutes.
1) BJ employees needed :
Days = (4/3)*50 * 80/60 = 88.89
Swing = (4/3)*65* 80/60 = 115.55
Grave = 30* 80/60 = 53.33
Total = 88.89+115.55+53.33 = 257.77
2) Craps employees needed:
Day = (4/3)*12 * 80/60 = 21.33
Swing = (4/3)*18* 80/60 = 32
Grave = (4/3)*3* 80/60 = 5.33
Total = 21.33+32+5.33 = 58.66
3) Bac employees needed:
Days = (4/3)*3 * 80/60 = 5.33
Swing = (4/3)*4* 80/60 = 7.11
Grave = (4/3)*1* 80/60 = 1.77
Total = 5.33+7.11+1.77 = 14.21
Get Answers For Free
Most questions answered within 1 hours.