Your options for shipping 96,620$ of machine parts from Baltimore to Kuala? Lumpur, Malaysia, are? (1) use a ship that will take 30 days at a cost of 3,590$ or? (2) truck the parts to Los Angeles and then ship at a total cost of $4710. The second option will take only 20 days. You are paid via a letter of credit the day the parts arrive. Your holding cost is estimated at 30?% of the value per yea
BLANK is more? economical, with a daily holding cost of $ BLANK
Please explain! Thanks
Option 1
Value of item , C = 96620
Holding cost , I = 30% of value per year = 30%/365 Value per day
Option 1
Holding cost for 30 days = (30*0.3 * 96620)/365 = 2382.4
Holding cost per day = 79.4
order cost = 3590
Total cost = 3590+2382.4 = 5972.4
Option 2:
Oder cost = 4710
For 20 days
Holding cost for 20 days = 20*0.3*9620/365 = 1588.2
Holding cost per day =52.94
Total cost = Order cost + Holding cost = 4710+1588.2 = 6298.27
If we see , Total cost
Total cost of option 1 < Total Cost of option 2
Even though holding cost per day in option 2 is less than option 1 , other cost is much high in option 2 that mitigate the saving of holding cost
so Option 1 is more economical with a daily holding cost of $79.4