Question

A time standard was set at 5.50 hours per unit based on the 100th unit produced...

A time standard was set at 5.50 hours per unit based on the 100th unit produced (i.e. ). If the task follows a 90 percent learning curve, what would the expected time be for the 200th, 300th, and 400 the units? (you need to start with the book’s method using the tables to find the learning rate)

Homework Answers

Answer #1

Time for nth unit = Time for 1st unit*Unit time factor

Time for 100th unit = Time for 1st unit*Unit time factor for 100th unit

From table 90%, unit time factor for 100th unit = 0.4966

5.5 = Time for 1st unit*0.4966

Time for 1st unit = 11.08 hours

Time for 200th unit = 11.08*0.4469 = 4.95 hours

Time for 300th unit = 11.08*0.4202 = 4.65 hours

Time for 400th unit = 11.08*0.4022 = 4.45 hours

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Champions Ltd is a manufacturer of rowing boats. It has designed a new boat called the...
Champions Ltd is a manufacturer of rowing boats. It has designed a new boat called the Drifter 25 and expects to produce the Drifter 25 in a continuous operation over an 18 month period. During this period, it is expected that a total of sixteen Drifter 25’s will be produced and sold. The production of the Drifter 25 is a labour intensive operation and units are produced one after another. The costs of producing the first Drifter 25 are as...
Marshall Co. produced a pilot run of eighty units of a recently developed piston used in...
Marshall Co. produced a pilot run of eighty units of a recently developed piston used in one of its products. Marshall expected to produce and sell 1,910 units annually. The pilot run required an average of 0.55 direct labor hours per piston for 80 pistons. Marshall experienced an eighty percent learning curve on the direct labor hours needed to produce new pistons. Past experience indicated that learning tends to cease by the time 1,280 pistons are produced. Marshall's manufacturing costs...
Harper Ltd is a manufacturer of rowing boats. It has designed a new boat called the...
Harper Ltd is a manufacturer of rowing boats. It has designed a new boat called the Seafarer and expects to produce the Seafarer in a continuous operation over an 18 month period. During this period, it is expected that a total of sixteen Seafarer’s will be produced and sold. The production of the Seafarer is a labour intensive operation and units are produced one after another. The costs of producing the first Seafarer are as follows: Skilled Labour – 1,000...
Marshall Co. produced a pilot run of eighty units of a recently developed piston used in...
Marshall Co. produced a pilot run of eighty units of a recently developed piston used in one of its products. Marshall expected to produce and sell 1,950 units annually. The pilot run required an average of 0.55 direct labor hours per piston for 80 pistons. Marshall experienced an ninety percent learning curve on the direct labor hours needed to produce new pistons. Past experience indicated that learning tends to cease by the time 1,280 pistons are produced. Marshall's manufacturing costs...
Rogen Corporation manufactures a single product. The standard cost per unit of product is shown below....
Rogen Corporation manufactures a single product. The standard cost per unit of product is shown below. Direct materials—1 pound plastic at $7.00 per pound $ 7.00 Direct labor—1.0 hours at $11.50 per hour 11.50 Variable manufacturing overhead 5.50 Fixed manufacturing overhead 6.50 Total standard cost per unit $30.50 The predetermined manufacturing overhead rate is $12 per direct labor hour ($12.00 ÷ 1.0). It was computed from a master manufacturing overhead budget based on normal production of 5,500 direct labor hours...
Trico Company set the following standard unit costs for its single product. Direct materials (30 Ibs....
Trico Company set the following standard unit costs for its single product. Direct materials (30 Ibs. @ $4 per Ib.) $ 120.00 Direct labor (5 hrs. @ $14 per hr.) 70.00 Factory overhead—variable (5 hrs. @ $8 per hr.) 40.00 Factory overhead—fixed (5 hrs. @ $10 per hr.) 50.00 Total standard cost $ 280.00 The predetermined overhead rate is based on a planned operating volume of 80% of the productive capacity of 60,000 units per quarter. The following flexible budget...
Trico Company set the following standard unit costs for its single product. Direct materials (30 Ibs....
Trico Company set the following standard unit costs for its single product. Direct materials (30 Ibs. @ $4.80 per Ib.) $ 144.00 Direct labor (7 hrs. @ $14 per hr.) 98.00 Factory overhead—variable (7 hrs. @ $6 per hr.) 42.00 Factory overhead—fixed (7 hrs. @ $9 per hr.) 63.00 Total standard cost $ 347.00 The predetermined overhead rate is based on a planned operating volume of 80% of the productive capacity of 67,000 units per quarter. The following flexible budget...
Trico Company set the following standard unit costs for its single product. Direct materials (30 Ibs....
Trico Company set the following standard unit costs for its single product. Direct materials (30 Ibs. @ $4 per Ib.) $ 120.00 Direct labor (5 hrs. @ $14 per hr.) 70.00 Factory overhead—Variable (5 hrs. @ $8 per hr.) 40.00 Factory overhead—Fixed (5 hrs. @ $10 per hr.) 50.00 Total standard cost $ 280.00 The predetermined overhead rate is based on a planned operating volume of 80% of the productive capacity of 60,000 units per quarter. The following flexible budget...
For many years, Thomson Company manufactured a single product called LEC 40. Then three years ago,...
For many years, Thomson Company manufactured a single product called LEC 40. Then three years ago, the company automated a portion of its plant and at the same time introduced a second product called LEC 90 that has become increasingly popular. The LEC 90 is a more complex product, requiring 0.80 hours of direct labor time per unit to manufacture and extensive machining in the automated portion of the plant. The LEC 40 requires only 0.40 hours of direct labor...
Question 3. Activity-Based Costing (ABC)   (20 marks) This question builds on prior studies and relates to...
Question 3. Activity-Based Costing (ABC)    This question builds on prior studies and relates to learning material and objectives from Topic 6. Jupiter Australasia Ltd owns Victory Mowers a manufacturer of gardening equipment which is sold domestically within Australia and to an increasing export market. Victory Mowers manufactures two different models of lawnmowers: the cheaper ‘Lawnmaster’ and the environmentally-friendly and more expensive ‘Green Machine’. A dispute has arisen between senior management at Victory Mowers over the strategic direction of the...