Determine the time required to perform the following activities. Using the predetermined time method MOST. Report the total time in TMU and seconds.
A. An operator walks 8 steps takes a handful of packages of
different sizes of a table then walks 10 steps, passes through a
door and walks three steps place the packages on a ledge.
B. The same operator from the position that is, walks 9 steps and start a machine operating for 4 seconds, with movement of 12 inches.
sequence | TMU | seconds | |
A | |||
B |
Answer:
|
TMU |
Seconds |
|
A |
A16+ G3+ A16 +B16+ A6+ P6 |
630 |
22.68s |
B |
A16+ M3+ X10 |
290 |
10.44s |
Explanation:
1 TMUs= 0.036s
1 index= 10 TMUs= 0.36s
Calculating the time required using MOST with sequence model ABGABPA and ABGMXI. (use the image attached for recognizing sequence)
A: A16+ G3+ A16 +B16+ A6+ P6= 63 index= 630 TMUs= 63*0.36s= 22.68s
A16=walks 8 steps, G3= takes a handful of packages of different sizes of a table, A16= walks 10 steps, B16= passes through a door, A6= three steps, P6= place the packages on a ledge.
B: A16+ M3+ X10= 29 index= 290 TMUs= 29*0.36s=10.44s
A16= walks 9 steps M3= start a machine operating with movement of 12 inches, X10= 4 seconds