Question

Three jobs are to be assigned to three machines. Cost for each job-machine combination appears in...

Three jobs are to be assigned to three machines. Cost for each job-machine combination appears in the table below. Perform the assignment method. What is the optimal assignment?

Machine A

Machine B

Machine C

Job 1

11

14

6

Job 2

8

10

11

Job 3

9

12

7

Homework Answers

Answer #1

Machine A

Machine B

Machine C

Job 1

11

14

6

Job 2

8

10

11

Job 3

9

12

7

Column reduction=

Machine A

Machine B

Machine C

Job 1

11-8

14-10

6-6

Job 2

8-8

10-10

11-11

Job 3

9-8

12-112

7-7

Machine A

Machine B

Machine C

Job 1

3

4

0

Job 2

0

0

5

Job 3

1

2

1

Row Reduction=

Machine A

Machine B

Machine C

Job 1

3-0

4-0

0-0

Job 2

0-0

0-0

5-0

Job 3

1-1

2-1

1-1

Machine A

Machine B

Machine C

Job 1

3

4

0

Job 2

0

0

5

Job 3

0

1

0

Job 1 will get assigned to Machine C

Job 3 will be assigned to Machine A

Job 2 will be assigned to Machine B

Total cost =6+10+9=25

KINDLY RATE THE ANSWER AS THUMBS UP. THANKS A LOT

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A plant has 4 operators to be assigned to four machines. the time (minutes) required by...
A plant has 4 operators to be assigned to four machines. the time (minutes) required by each worker to produce a product on each machine is shown in the following table" Determine the optimal assignemnt and compute total minimum time. Machine Operator A B C D Supply Assigned 1 0 0 1 0 1 2 1 0 0 0 1 3 0 1 0 0 1 4 0 0 0 1 1 Demand 1 1 1 1 4 Assigned Total...
Part 5.   Questions 8,9. [ Use Video-1 under Scheduling heading. ] [Note: The order of jobs...
Part 5.   Questions 8,9. [ Use Video-1 under Scheduling heading. ] [Note: The order of jobs in a schedule is 1st,2nd,3rd, for A,B,C, respectively.] Consider the jobs scheduled on two machines in the order of (A,B,C) where each job is started as soon as possible. The processing times for each job on each machine are given in the table below. Assume time on machine #1 is represented with “(1)” and on machine #2 with “(2)”. Job Machine#1 Time Machine#2 Time...
Use Johnson's rule to determine the optimal sequencing for the five jobs to be processed on...
Use Johnson's rule to determine the optimal sequencing for the five jobs to be processed on two machines in a fixed order (Machine 1 before Machine 2). The processing times are given in the table below. Job Machine 1 Machine 2 L 10 2 M 5 4 N 7 5 O 3 6 P 1 7 ** Please show excel steps so i can see if I did this right** thanks What is the optimal sequence? What is the total...
The table below presents three samples of data. If we conduct a hypothesis test for the...
The table below presents three samples of data. If we conduct a hypothesis test for the equality of all three means with the statistical confidence of 90%, what would the value of the Mean Squares Between Groups be? Sample 1 Sample 2 Sample 3 7 11 6 5 8 5 7 11 4 6 7 5 6 13 14 6 13 5 6 12 5 6 11 6 8 8 8 9 7 6 7 6 14 9 7 4...
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. It started only two jobs during March—Job P and Job Q.
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. It started only two jobs during March—Job P and Job Q. Job P was completed and sold by the end of March and Job Q was incomplete at the end of March. The company uses a plantwide predetermined overhead rate based on direct labor-hours. The following additional information is available for the company as a whole and for Jobs P and Q (all data...
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. It started only two jobs during March—Job P and Job Q
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. It started only two jobs during March—Job P and Job Q. Job P was completed and sold by the end of March and Job Q was incomplete at the end of March. The company uses a plantwide predetermined overhead rate based on direct labor-hours. The following additional information is available for the company as a whole and for Jobs P and Q (all data...
Today is Nov. 16. The following jobs need to be scheduled on the same machine. Job...
Today is Nov. 16. The following jobs need to be scheduled on the same machine. Job A, Process time =14 days, and due date November 26 Job B, Process time= 11 days, and due date = November 25 Job C, Process time =7 days, and due date= December 14 Job D, Process time=6 days, and due date= November 29 Job E, Process time= 2 days, and due date= November 20 Schedule the jobs according to SPT. What are the average...
If the following jobs are sequenced according to the SLACK rule then job A would be...
If the following jobs are sequenced according to the SLACK rule then job A would be completed on day (assume zero for today's date) Job - Processing Time (days) - Due Date A 8 12 B 6 15 C 11 17 D 7 10 E 3 8 Select one: A. 7. B. 15. C. 8. D. 12.
The table below presents three samples of data. Please conduct a test for the equality of...
The table below presents three samples of data. Please conduct a test for the equality of the three population means with 90% confidence. Sample 1 Sample 2 Sample 3 7 11 6 5 8 5 7 11 4 6 7 5 6 13 14 6 13 5 6 12 5 6 11 6 8 8 8 9 7 6 7 6 14 9 7 4 8 8 8 8 9 13 9 6 10 8 11 14 8 9 14...
RESTORE machine shop makes customized replacement parts for older equipment. All customer jobs listed must be...
RESTORE machine shop makes customized replacement parts for older equipment. All customer jobs listed must be machined first, then polished. Determine the optimal processing sequence of the six jobs listed below. Jobs Machining Hrs Polishing Hrs A 5 4 B 7 3 C 3 2 D 4 1 E 1 2 F 3 4 job A is finished at time 21 11 9 13
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT