Currently, jobs arrive at 12 per day and you have (just) enough capacity at each station (i.e., the departure rate is also 12 per day). If you want to change to a contract that promises a throughput time of at most 0.25 days to reap the full profits, then what should you set your WIP Limit as?
Question: Currently, jobs arrive at 12 per day and you have (just) enough capacity at each station (i.e., the departure rate is also 12 per day). If you want to change to a contract that promises a throughput time of at most 0.25 days to reap the full profits, then what should you set your WIP Limit as?
Answer: WIP limit = 0.5
Explanation:
Given that:
Arriving Time = 12 days
Departure Time = 12 days
Throughtput Time = 0.25
Now:
Efficiency is given by:
Efficiency = Arriving Time / (Arriving Time + Departure Time)
Therefore:
Efficiency = 12 / (12 + 12)
Efficiency = 12 / 24
Efficiency = 0.5
Efficiency% = 50%
Now:
Work-In-Progress (WIP) is given by:
WIP = Throughput Time / Efficiency
Therefore;
WIP = 0.25 / 50%
WIP = 0.25 / 0.5
WIP = 0.5