Cosmos. The processing time for each of these stages are shown in minutes.
2.5 minutes 10 minutes 15 minutes 4 minutes
Station A Station B Station C Station D
Under steady state
Hourly Capacity of stations
A = 60/2.5 =24
B= 60/10 =6
C= 60/15 =4
D=60/4 =15
The slowest resource is station C which has a capacity of 4 units per hour, which restricts the process capacity to this level. The maximum output is 4 per hour.
2. New process time of station C = 15x(1-0.6) =6 minutes
New output of station C = 60/6 =10 per hour.
Noe, the new bottleneck is B which has output of 6 per hour. Now, the capacity of process will be 6 per hour
Number of shifts each week = 6 days x 2 = 12 shifts
Hours per shift = 9-0.5 =8.5
Weekly hours = 12 x8.5 =102
Weekly production = 102x6 =612 units