There are FIVE processesing station in a prodcution system: P1, P2, P3, P4 and P5. The...

There are FIVE processesing station in a prodcution system: P1, P2, P3, P4 and P5. The times taken at each process are as follows 2 minutes, 6 minutes, 4 minutes, 9.4 and 13 minutes. Job request inflow rate is 16 per hour and jobs requests are accepted for six hours only. The systems closes after all accepted jobs have been completed, that is at the closing there are no unfinished jobs in the system.

The system capacity =   /hour

The average waiting time in the system in minutes is =  minutes

The throughput time of the system is =  minutes

The average inventory in the system is =   jobs

The average waiting time before P2 =  minutes

The average waiting time before P3 =  minutes

The average waiting time before P4 =  minutes

The average waiting time before P5 =  minutes

Homework Answers

Answer #1

Station P5 has the maximum time = 13 minutes

Therefore, cycle time = 13 minutes

The system capacity = 60/13 = 4.62 per hour

Number of jobs waiting to be processed at the end of six hours = 6*(16-4.62) = 68.3

The average waiting time in the system = 68.3*13/2 = 444 minutes

The Throughput time of the system = 2+6+4+9.4+13 = 34.4 minutes

The average inventory in the system = 68.3/2 = 34.15 jobs

The average waiting time before P2 = 6*(16*6-60)/2 = 108 minutes

The average waiting time before P3 = 6*(16*4-60)/2 = 12 minutes

The average waiting time before P4 = 6*(16*9.4-60)/2 = 271.2 minutes

The average waiting time before P5 = 6*(16*13-60)/2 = 444 minutes

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
**Operating System** FCFS Example Processes arrived in the order of P2,P3,P1. Process Burst Time P1 24...
**Operating System** FCFS Example Processes arrived in the order of P2,P3,P1. Process Burst Time P1 24 P2 3 P3 3 Calculate the waiting times for P1, P2, and P3 Draw the Gantt Chart and calculate the average waiting time.
Consider a system with eight resources currently allocated as follows: Resource Allocated to Process R1 P4...
Consider a system with eight resources currently allocated as follows: Resource Allocated to Process R1 P4 R2 P1 R3 P5 R4 P7 R5 P2 R6 P8 R7 P3 R8 P6 The following sequence of additional resource requests is then processed. (Let REQ(A,B) denote process A's request for resource B.) REQ(P4, R2) REQ(P3, R6) REQ(P2, R1) REQ(P7, R7) REQ(P6, R1) REQ(P5, R7) The above sequence of requests do not cause a deadlock. Verify this fact by constructing a resource-allocation graph involving...
What is the average waiting time for Processes If the Operating System uses the Priority Scheduling...
What is the average waiting time for Processes If the Operating System uses the Priority Scheduling (PS) Scheduling Algorithm? (P1=20 ms, P2=15 ms, P3=10 ms, P4=5 ms) Priority Order: P1, P4, P3, P2
Process Burst Time Priority Arrival p1 8 15 0 p2 3 20 0 p3 4 20...
Process Burst Time Priority Arrival p1 8 15 0 p2 3 20 0 p3 4 20 20 p4 4 20 25 p5 5 5 45 p6 5 15 55 The following processes are being scheduled using a preemptive, priority-based, round-robin scheduling algorithm. Each process is assigned a numerical priority, with a higher number indicating a higher relative priority. The scheduler will execute the highest-priority process. For processes with the same priority, a round-robin scheduler will be used with a time...
let p1(x) = x^2-3x-10 ,p2(x)=x^2-5x+1,p3(x)=x^2+2x+3 and p4(x)=x+5 a- As an alternative ; we can form additional...
let p1(x) = x^2-3x-10 ,p2(x)=x^2-5x+1,p3(x)=x^2+2x+3 and p4(x)=x+5 a- As an alternative ; we can form additional equation involving a1,a2,a3,and a4 using differntiation.explain how how to produce a system of equation with unknown constant a1,a2,a3,a4. Since there are 4 unknown ,you will need 4 equattion find them b- Find Basis for the vector space spanned by p1(X),p2(x),p3(x),p4(x). express any reductant vector in terms of linear combination of the others .Note you might want to use row in the changes?
**Operating System** Preemptive SJF The newly arrived process with shorter CPU burst will preempt the currently...
**Operating System** Preemptive SJF The newly arrived process with shorter CPU burst will preempt the currently executing process. Process Arrival Time Burst Time P1 3 8 P2 2 4 P3 1 9 P4 0 5 Draw the Gantt Chart and calculate the average waiting time.
MOMENT OF INERTIA LAB Apparatus Only (P3) With Masses (P4) With Block (P5) Setup You have...
MOMENT OF INERTIA LAB Apparatus Only (P3) With Masses (P4) With Block (P5) Setup You have a T-shaped apparatus that can spin about a vertical axis. One end of a light string is wrapped around the vertical shaft of the apparatus. The other end passes over a pulley and has a known mass hung from it to establish tension in the string. By measuring the acceleration of the hanging mass, the rotational inertia of the apparatus can be determined. Specifically,...
Problem 15-1A Production costs computed and recorded; reports prepared LO P1, P2, P3, P4 [The following...
Problem 15-1A Production costs computed and recorded; reports prepared LO P1, P2, P3, P4 [The following information applies to the questions displayed below.] Marcelino Co.'s March 31 inventory of raw materials is $86,000. Raw materials purchases in April are $560,000, and factory payroll cost in April is $385,000. Overhead costs incurred in April are: indirect materials, $56,000; indirect labor, $24,000; factory rent, $31,000; factory utilities, $21,000; and factory equipment depreciation, $56,000. The predetermined overhead rate is 50% of direct labor...
Problem 15-1A Production costs computed and recorded; reports prepared LO C2, P1, P2, P3, P4 [The...
Problem 15-1A Production costs computed and recorded; reports prepared LO C2, P1, P2, P3, P4 [The following information applies to the questions displayed below.] Marcelino Co.'s March 31 inventory of raw materials is $80,000. Raw materials purchases in April are $590,000, and factory payroll cost in April is $379,000. Overhead costs incurred in April are: indirect materials, $58,000; indirect labor, $23,000; factory rent, $36,000; factory utilities, $21,000; and factory equipment depreciation, $52,000. The predetermined overhead rate is 50% of direct...
Required information Problem 19-2A Source documents, journal entries, overhead, and financial reports LO P1, P2, P3,...
Required information Problem 19-2A Source documents, journal entries, overhead, and financial reports LO P1, P2, P3, P4 [The following information applies to the questions displayed below.] Bergamo Bay's computer system generated the following trial balance on December 31, 2017. The company’s manager knows something is wrong with the trial balance because it does not show any balance for Work in Process Inventory but does show a balance for the Factory Overhead account. In addition, the accrued factory payroll (Factory Payroll...