Annual requirement = 42,800
Worker hours per month = 164 hours
Productivity = 10 per labor hour (in the question it is given as 0 , which is apparently a typo, I have considered 10 for the purpose of demonstrating the method and calculation)
Total number of workers required = Annual requirement / (12 * Worker hours per month x productivity)
= 42800 / (12* 164 * 10)
= 2.2
~ 3 (rounded-up) I
NOTE: Do not use this answer, if the actual productivity is something else than 10 per labor hour. The purpose of this is just to show the method and calculation