Product A is assembled from 6 components. The components are B, C, D, E, F, G....

  1. Product A is assembled from 6 components. The components are B, C, D, E, F, G. Components B, D, and F are purchased from a supplier, complete and ready to assemble. Component C is assembled from parts H, I, and J. Component E is assembled from parts K and L. Component G is made in the plant from raw materials. Part H is made from parts M and N. Part L is made from parts P, Q, and R. Part N is made from parts S and T.
    1. Draw the product structure tree.
    2. If all assemblies and components take 2 days, what is the shortest time it will take to produce A?
    3. If components B, C, D, and parts F, H, I, K, P, Q, and T are in inventory ready for use, how long will it take to produce A? Justify your answer.

Homework Answers

Answer #1

a)

The product structure tree is following:

----------------------------------------------------------------------

b)

In the product structure tree, we see that it has 5 levels.

and each assembly, component having 2 days lead time,

Shortest time to product A = 5*2 = 10 days

----------------------------------------------------------------------

c)

If components B, C, D, and parts F, H, I, K, P, Q, and T are in inventory, then remaining items required for production of A are: E, G, L, R

of these, items A, E, L, R span across 4 levels.

Therefore, time taken to produce A = 4*2 = 8 days

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Let S = {A, B, C, D, E, F, G, H, I, J} be the set...
Let S = {A, B, C, D, E, F, G, H, I, J} be the set consisting of the following elements: A = N, B = 2N , C = 2P(N) , D = [0, 1), E = ∅, F = Z × Z, G = {x ∈ N|x 2 + x < 2}, H = { 2 n 3 k |n, k ∈ N}, I = R \ Q, J = R. Consider the relation ∼ on S given...
Given that, for some a, b, c, d, e, f, g, h, i ∈ R, [a...
Given that, for some a, b, c, d, e, f, g, h, i ∈ R, [a b c d e f g h i ] = 5, evaluate the following determinants: (c) [ka ld mg kb le mh kc lf mi] Here, k, l, and m are non-negative constants.
Product A is made from components B and C. Item​ B, in​ turn, is made from...
Product A is made from components B and C. Item​ B, in​ turn, is made from D and E. Item C also is an intermediate​ item, made from F and H.​ Finally, intermediate item E is made from H and G. Note that item H has two parents. The following are item lead​ times: Item A B C D E F G H Lead Time​ (weeks) 1 1 2 2 6 4 4 6 a. What lead time​ (in weeks)...
Thermodynamics: Consider the equilibrium reaction A(g) + B(g) -><- C(g)+D(g). At T=298 K, the standard enthalpies...
Thermodynamics: Consider the equilibrium reaction A(g) + B(g) -><- C(g)+D(g). At T=298 K, the standard enthalpies of formation of the components in the gas phase are -20, -40, -30, and -10 kJ/mol for A,B,C, and D, respectively. The standard-state entropies of the components in the gas phase are 30, 50, 50, and 80 J/(mol K), in the same order. The vapor pressure of liquid C at this temperature is 0.1 bar, while all other components are volatile gases with Henry's...
Consider permutations of the 26-character lowercase alphabet Σ={a,b,c,d,e,f,g,h,i,j,k,l,m,n,o,p,q,r,s,t,u,v,w,x,y,z}. In how many of these permutations do a,b,c...
Consider permutations of the 26-character lowercase alphabet Σ={a,b,c,d,e,f,g,h,i,j,k,l,m,n,o,p,q,r,s,t,u,v,w,x,y,z}. In how many of these permutations do a,b,c occur consecutively and in that order? In how many of these permutations does a appear before b and b appear before c?
9. Let S = {a,b,c,d,e,f,g,h,i,j}. a. is {{a}, {b, c}, {e, g}, {h, i, j}} a...
9. Let S = {a,b,c,d,e,f,g,h,i,j}. a. is {{a}, {b, c}, {e, g}, {h, i, j}} a partition of S? Explain. b. is {{a, b}, {c, d}, {e, f}, {g, h}, {h, i, j}} a partition of S? Explain. c. is {{a, b}, {c, d}, {e, f}, {g, h}, {i, j}} a partition of S? Explain.
2. Let A = {p, q, r, s}, B = {k, l, m, n}, and C...
2. Let A = {p, q, r, s}, B = {k, l, m, n}, and C = {u, v, w}, Define f : A→B by f(p) = m, f(q) = k, f(r) = l, and f(s) = n, and define g : B→C by g(k) = v, g(l) = w, g(m) = u, and g(n) = w. Also define h : A→C by h = g ◦ f. (a) Write out the values of h. (b) Why is it that...
The following table lists the components needed to assemble an end item, lead times (in weeks),...
The following table lists the components needed to assemble an end item, lead times (in weeks), and quantities on hand. Item Lead Time Amount on Hand Direct Components End 2 0 L(2), C(1), K(3) L 2 8 B(2), J(3) C 3 12 G(2), B(2) K 3 17 H(4), B(2) B 2 32 J 3 27 G 3 5 H 3 0 a. If 43 units of the end item are to be assembled, how many additional units of B are...
Player A    B       C         D         E         F       G&
Player A    B       C         D         E         F       G         H       I        J       K       Reported weight 68      74     66.5    69       68      71       70     70      67     68      70        Measured weight 66.8   73.9   66.1   67.2     67.9   69.4   69.9   68.6   67.9   67.6 68.8 Height Difference 1.2      0.1     0.4    1.8      0.1      1.6      0.1     1.4   -0.9    0.4     1.2 Mean d = 0.672727    Standard Deviation S = 0.825943    Sample Size   n = 11 If you are asked to build a 95% confidence interval for µd , which critical...
Product Y is made from one component P, three components Q, and one 2 components R.  P...
Product Y is made from one component P, three components Q, and one 2 components R.  P is made from two parts S, Q is made from one S, and R is made from two part S and three part T.  Other data includes: Part                 Lead time             Lot size                   On hand                 Scheduled receipts         Safety Stock Y                         1                                 lot-for-lot               30                                              none                                          5 P                        2                                   40                              15                                              none                                          none Q                        2                                 100                               8                                               none                                          8 R                        3                                 120                             30                                              none                                          none S                         2                                 500                             20                                              500, week 1                          20 T                         2                                 600                           370                                             none                                          50 a.    Draw the BOM for product Y. b. Complete the MRP explosion for product Y.  Identify any problems, and discuss possible solutions Master Production Schedule Finished...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT