Question

What is the process design of IKEA ? and how they planning and control ?

What is the process design of IKEA ? and how they planning and control ?

Homework Answers

Answer #1

Process Design is implemented by IKEA in it’s overall operations related to buying inventory, managing at warehouse and selling to customers and is well planned and controlled with following points and their effective results:

  • In 2015, produced renewable energy 75% of its consumption
  • By 2020, it has target to produce 100% energy of its consumption
  • IKEA spent 1.35 m Euros to help cotton farmers improve their incomes and reduce the use of pesticides and water r on their crops
  • In 2013, 1/3rd if its wood was certified by Forest Stewardship Council
  • 68% of paper in IKEA catalogue is FSC certified
  • 98% of the main materials in household furnishing products are Recyclable, recycled or renewable.
  • IKEA recycles 87% of its waste
  • It has started investing heavily in installation of solar panels and wind farms on IKEA buildings worldwide
  • Discounts to those customers who wish to do a full solar installation at their homes.
  • 1/4th of IKEA stores have electric vehicle charging stations for customers
  • Appointed a full time Chief Sustainability Officer
  • IKEA group owns IKEA Green tech, which invests in start ups who are involved in technologies to increase sustainable business operations
  • Code of Conduct for Suppliers – Ikea WAY or IWAY :-   

Outlines the expectations of suppliers

Those found to be in violation of IWAY could be dropped as a supplier

Supplier cannot use forced or child labour

One person is assigned to comply with IWAY standards on suppliers end

Signed document by sub-contractors of suppliers to comply with IWAY

Internal compliance audit every 12 months

Work hours not exceeding 60 hours per week

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
"control system" Design a system that will run on a PID process
"control system" Design a system that will run on a PID process
List and describe 4 ways to maintain goals through Business Process Control Planning
List and describe 4 ways to maintain goals through Business Process Control Planning
Dynamics and process control question Design a controller for the loop-pro case study for the Cascaded...
Dynamics and process control question Design a controller for the loop-pro case study for the Cascaded Superheater (under Utility Case Studies) Include a 2-page memo with a block diagram for the process, a description of how you tuned it, and describe how it performs in setpoint tracking and disturbance rejection.
*Project* Design a system that will run on a PID process i just want any control...
*Project* Design a system that will run on a PID process i just want any control project that work in PID process
Why is what is measured in the control process probably more critical to the control process...
Why is what is measured in the control process probably more critical to the control process than how it is measured? Support your thoughts.
How is distribution requirements planning (DRP) used to enhance supply chains? Also, what is process thinking...
How is distribution requirements planning (DRP) used to enhance supply chains? Also, what is process thinking and what is the anatomy of a process?
How to control for unwanted influences in the experimental design? There are four ways: matching, blocking?...
How to control for unwanted influences in the experimental design? There are four ways: matching, blocking? and what are the other two?
Discuss how important the teacher is in the curriculum planning process
Discuss how important the teacher is in the curriculum planning process
IKEA’s Global Strategy Walk into an IKEA store anywhere in the world, and you would recognize...
IKEA’s Global Strategy Walk into an IKEA store anywhere in the world, and you would recognize it instantly. Global strategy standardization is rampant! The warehouse-type stores all sell the same broad range of affordable home furnishings, kitchens, accessories, and food. Most of the products are instantly recognizable as IKEA merchandise, with their clean yet tasteful lines and functional design. With a heritage from Sweden (IKEA was founded in 1943 as a mail-order company, and the first store opened in Sweden...
Once the nursing diagnosis have been designated, how are they prioritized? During the planning process, what...
Once the nursing diagnosis have been designated, how are they prioritized? During the planning process, what questions should the nurse consider?
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT