You wish to set up a plant for manufacturing Chemical Equipment
in UAE.
Use the PIP framework to assess the problems & prospects for
your venture.
PIP or program Impact pathways is the pathway that descibes from intervention input upto programmatic delivery, household and individual utilization to its desired impact. Through this process from input to impact , a foundation is laid for planning, training, monitoring and evaluation of the process.
The key component in this framework is to collect on-going information and analyse the data.
The following steps in the PIP framework:
While setting up the chemical plant in UAE,the skeleton framework will look something like this:
Get Answers For Free
Most questions answered within 1 hours.