I need to develop a work breakdown structure (WBS) for building a fence around the backyard
Answer-
-work breakdown structure (WBS) for building a fence around the backyard :
Work breakdown structure is an organized strategy used to part an overall undertaking into non overlapping segment and distinguish deliverables for each segment .
Work breakdown structure -
For building a fence around the backyard. days
A-General conditions. ( 11 days)
to continue and sign contract 3 days Prepare and submit venture plan 2 days Obtain building a fence license 4 days Submit preliminary drawing 2 days .
B-Long lead obtainment 2 days
Submit fence drawing and request things 2 days
C activate nearby 2 days
Prepare site and lay down fence 2 days Site grading and utilities 10 days We can easily give the shape of graph for easy understanding.