Question

. Brilliant Toothpaste Company has been having a problem with some of the tubes of toothpaste...

. Brilliant Toothpaste Company has been having a problem with some of the tubes of toothpaste leaking. The tubes are packed in containers with 100 tubes each. Fifteen containers of toothpaste have been samples. The following number of tubes were found to have leaks:

Sample Number of leaky tubes

1 4

2 8

3 12

4 11

5 12

6 6

7 10

8 9

9 5

10 8

11 6

12 8

13 9

14 7

15 11

Calculate the limits for a 3-sigma p-chart, draw the chart and plot the sample results in Excel (watch podcast.) Write an interpretation of the results

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen...
The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen samples of five completed mortgage transactions each were taken during a period when the process was believed to be in control. The times to complete the transactions were measured. The means and ranges of the mortgage process transaction​ times, measured in​ days, are as​ follows:                                                                                                                                                  Sample 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Mean 19...
Happy Oil Processing needs to monitor the amount of oil they put in 1-liter containers on...
Happy Oil Processing needs to monitor the amount of oil they put in 1-liter containers on their filling line. They have had problems with underfilled containers.       Samples of 250 containers were collected 4 times a day for 12 days.   They’ve asked you to create an np-chart for the filling process and interpret the results. a)   What values will be used for the centerline, upper control limit, and lower control limit? (You only need to make a table of the...
Supplementary Problem 18.15 A bottled-water company has been randomly inspecting bottles of water to determine whether...
Supplementary Problem 18.15 A bottled-water company has been randomly inspecting bottles of water to determine whether they are acceptable for delivery and sale. The inspectors are looking at water quality, bottle condition, and seal tightness. A series of 10 random samples of 50 bottles each is taken. Some bottles are rejected. Use the following information on the number of bottles from each batch that were rejected as being out of compliance to construct a p chart. Sample N Number out...
Using samples of 200 credit card statements, an Auditor found the following: ---Sample Number: 1    2    ...
Using samples of 200 credit card statements, an Auditor found the following: ---Sample Number: 1    2     3     4     5     6     7   8 9    10    11   12   13   14   15 Number of Errors:    17  12   11   12   10    10   17   15   12   13    15    10     7     8      10 Determine lower and upper control limits for the fraction of errors using three-sigma limits. Question 8 options: 0 , .126 .017 , .101 .026 , .093 .009 , .109 None of the Above The Quality Control...
HCH Manufacturing has decided to use a p-Chart with 2-sigma control limits to monitor the proportion...
HCH Manufacturing has decided to use a p-Chart with 2-sigma control limits to monitor the proportion of defective steel bars produced by their production process. The quality control manager randomly samples 250 steel bars at 12 successively selected time periods and counts the number of defective steel bars in the sample. Sample   Defects 1   7 2   10 3   14 4   8 5   9 6   11 7   9 8   9 9   14 10   11 11   7 12   8 Step 1 of...
Twelve​ samples, each containing five​ parts, were taken from a process that produces steel rods at...
Twelve​ samples, each containing five​ parts, were taken from a process that produces steel rods at Emmanual​ Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. Refer to Table S6.1 - Factors for computing control chart limits (3 sigma) for this problem. Sample ​Size, n Mean​ Factor, A2 Upper​ Range, D4 Lower​ Range, D3 2 1.880 3.268 0 3 1.023 2.574 0 4 0.729 2.282 0...
The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen...
The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen samples of five completed mortgage transactions each were taken during a period when the process was believed to be in control. The times to complete the transactions were measured. The Money Pit Mortgage Company made some changes to the process and undertook a process capability study. The following data were obtained for 15 samples of size 5. Based on the individual​ observations, management estimated...
4. A baker recorded the number of burnt marks on 22 samples (production days in July)...
4. A baker recorded the number of burnt marks on 22 samples (production days in July) of 500 rolls. Sample Number Number of burnt marks Sample Number Number of burnt marks (a) Develop an appropriate control chart to determine if the process is in statistical control. (b) Compute the centerline and control limits for the control chart for the average number of burnt marks per unit. Do not redraw the chart. Sample Number Number of burnt marks Sample Number Number...
A manufacturing company makes runners for cabinet drawers. To assess the quality of the manufacturing process,...
A manufacturing company makes runners for cabinet drawers. To assess the quality of the manufacturing process, the company collected one sample of 300 consecutively manufactured runners each day for 20 days and counted the number of defective items. The resulting sample data are: Sample:             1      2      3      4      5      6      7      8      9    10 Sample Size:   300 300 300 300 300 300 300 300 300 300 Defectives:        8       6     11    15    12    11     9      6      5      4 The Upper Control Limit, UCL, for a p control chart based on the above data is
Jamison Kovach Supply Company manufactures paper clips and other office products. Although​inexpensive,paper clips have provided the...
Jamison Kovach Supply Company manufactures paper clips and other office products. Although​inexpensive,paper clips have provided the firm with a high margin of profitability. Sample size is 50 Results are given for the last 10 samples. Sample   1   2   3   4   5   6   7   8   9   10 Defectives   5   7   2   6   6   5   4   5   2   11 Establish the control limits to include 99.73% of the random variation in defectives UCLp= _____(enteryour response as a number between 0 and​1,rounded to...