Question

A copy machine is available 18 hours a day. On a typical day, the machine needs...

A copy machine is available 18 hours a day. On a typical day, the machine needs to process 320 jobs. Each job takes about 1.5 minutes on the machine, 0.5 minute of which is processing time and 1 minute is setup time (logging in, defining the job). About 25% of the jobs need to be reworked, in which the set?up time and the processing time have to be repeated once. In the remaining time, the equipment is idle. You would need to show steps and use 2 decimals in calculations.

(a)[2] Draw a tree diagram to show the breakdown of equipment time. Alternatively, you can opt to draw a diagram like Figure 8.1 (page 214) to illustrate the breakdown of equipment time.

(b)[2] Define and calculate total non?value added time in minutes.

(c)[2] Define and calculate total value?added time in minutes.

(d)[3] Calculate total waste time in minutes. Give a detailed breakdown of waste time.

(e)[1] What is the OEE of the equipment? (percentage, 2 decimals, i.e. 23.67%)

Homework Answers

Answer #1

(b) Total available time = 18x60 =1080 min.

Total processing time = 320x0.5 = 160 min

Total set up time = 320x1 =320 min.

Total rework time = 320x0.25 ( 1+0.5) =120 min.

Total Non value added time = set up time + rework time = 320+120 = 440 min.

(c) Total value added time = processing time = 160 min.

(d) Total waste time = set up time + rework time + Idle time = 320+120+ 480 = 920 mn.

(e) OEE = processing time / time available = 160/1080 = 0.1481 = 14.81%

(a)

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The admin office has one centralized copy machine located in a small room in the office....
The admin office has one centralized copy machine located in a small room in the office. Jobs arrive at this copy center according to a Poisson process at a mean rate of 2 per day. The processing time to perform each job has an exponential distribution with a mean of 1/4 day. Because the copy jobs are bulky, those not being worked on are currently being stored in a room some distance from the copy machine. However, to save time...
A bike frame has to go through the welding operation. The time in the welding operation...
A bike frame has to go through the welding operation. The time in the welding operation is spent as follows: 2 hours waiting in front of the cutting machine for the batch to start, 0.5 hour waiting for the setup of the machine, 2 hours waiting for the other pieces of the batch to go through cutting, 1 minute at the cutting machine, and 1.5 hours waiting for the transfer to the welding machine; then, at the welding machine, the...
Exercise 7A-1 Time-Driven Activity-Based Costing [LO 7-6] Saratoga Company manufactures jobs to customer specifications. The company...
Exercise 7A-1 Time-Driven Activity-Based Costing [LO 7-6] Saratoga Company manufactures jobs to customer specifications. The company is conducting a time-driven activity-based costing study in its Purchasing Department to better understand how Purchasing Department labor costs are consumed by individual jobs. To aid the study, the company provided the following data regarding its Purchasing Department and three of its many jobs: Number of employees 20 Average salary per employee $ 25,000 Weeks of employment per year 52 Hours worked per week...
Consider a batch manufacturing process in which a machine processes jobs in batches of three units....
Consider a batch manufacturing process in which a machine processes jobs in batches of three units. The process starts only when there are three or more jobs in the buffer in front of the machine. Otherwise, the machine stays idle until the batch is completed. Assume that job interarrival times are uniformly distributed between 2 and 8 hours, and batch service times are uniformly distributed between 5 and 15 hours. Assuming the system is initially empty, simulate the system manually...
please post solutions using R Consider a batch manufacturing process in which a machine processes jobs...
please post solutions using R Consider a batch manufacturing process in which a machine processes jobs in batches of three units. The process starts only when there are three or more jobs in the buffer in front of the machine. Otherwise, the machine stays idle until the batch is completed. Assume that job interarrival times are uniformly distributed between 2 and 8 hours, and batch service times are uniformly distributed between 5 and 15 hours. Assuming the system is initially...
Case Study 1: A Day in the Life Rachel, the project manager of a large information...
Case Study 1: A Day in the Life Rachel, the project manager of a large information systems project, arrives at her office early to get caught up with work before her co- workers and project team arrive. However, as she enters the office she meets Neil, one of her fellow project managers, who also wants to get an early start on the day. Neil has just completed a project overseas. They spend 10 minutes socializing and catching up on personal...
Case Study 1:  A Day in the Life Rachel, the project manager of a large information systems...
Case Study 1:  A Day in the Life Rachel, the project manager of a large information systems project, arrives at her office early to get caught up with work before her co- workers and project team arrive. However, as she enters the office she meets Neil, one of her fellow project managers, who also wants to get an early start on the day. Neil has just completed a project overseas. They spend 10 minutes socializing and catching up on personal news....
1. Aztec Builders allocates manufacturing overhead to jobs based on machine hours. The company has the...
1. Aztec Builders allocates manufacturing overhead to jobs based on machine hours. The company has the following estimated costs for the upcoming year: Direct materials used $25,000 Direct labour costs $62,000 Salary of factory supervisor $50,000 Advertising expense $33,000 Heating and lighting costs for factory $51,000 Depreciation on factory equipment $19,000 Sales commissions $8,000 The firm estimates that 1,800 direct labour hours will be worked in the upcoming year, while 2,000 machine hours will be used during the year. The...
In economics, the term “scarcity”meansthere .
In economics, the term “scarcity”meansthere                    .is a shortage of the factors ofproductionis equilibrium in themarketare unlimited wants and only limitedresourcesare limited wants and unlimitedresourcesA country has an absolute advantage in producing cars ifthat country                    .has a lower opportunity cost of producing cars than any othercountrycan produce more cars in a given amount of time than any othercountryhas a higher opportunity cost of producing cars than any othercountrycharges the highest price forcarsDuring bad economic times, many people lose their jobs. How would that...
1. What is an ISP (Integrated Service Provider) for supply chains? (1 point) A. A consultant...
1. What is an ISP (Integrated Service Provider) for supply chains? (1 point) A. A consultant agency which integrates the supply chain for companies B. A 2 PL or a 3PL, but not a 4PL C. A company supplying transportation and warehousing services D. A logistics service company specialized in suppling VAS (value added services) 2. What characterizes a 4 PL? (1 point) A. They are non-asset based and provides integrated services primarily supplied by asset based providers, for example...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question